10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Thickness: As required to provide the heights indicated.<br />

B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, felt or glass-fiber mat<br />

facer on both major surfaces.<br />

C. Perlite Board Insulation: ASTM C 728; composed of expanded perlite, cellulosic<br />

fibers, binders, and waterproofing agents with top surface seal-coated.<br />

D. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of<br />

! inch per 12 inches (1:24), unless otherwise indicated.<br />

E. Provide performed saddles, crickets, tapered edge strips, and other insulation<br />

shapes to provide slopes to drain. Fabricate to slope of ! inch per 12 inches (1:24),<br />

unless otherwise indicated.<br />

1. Provide crickets at high sides of mechanical roof-top equipment to direct<br />

water around equipment.<br />

2.07 INSULATION ACCESSORIES<br />

A. General: Roof insulation accessories recommended by insulation manufacturer for<br />

intended use and compatible with membrane roofing.<br />

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting<br />

corrosion-resistance provisions in FMG 4470, designed for fastening roof insulation<br />

to substrate, and acceptable to roofing system manufacturer.<br />

C. Insulation Cant Strips: ASTM C 728, perlite insulation board.<br />

PART 3 – EXECUTION<br />

3.01 EXISTING CONDITIONS<br />

A. Removal of Existing Roofing System: Remove existing ballast, built-up roof<br />

membrane and insulation in the area affected by the new construction. Install new<br />

insulation as indicated in the drawings to provide the slopes indicated and apply new<br />

built-up asphalt roof system. Tie in to existing built-up roof as recommended by<br />

manufacturer to maintain integrity and water-tightness of the membrane.<br />

3.02 EXAMINATION<br />

A. Examine substrates, areas, and conditions, with Installer present, for compliance<br />

with the following requirements and other conditions affecting performance of roofing<br />

system:<br />

1. Verify that roof openings and penetrations are in place and set and braced<br />

and that roof drains are securely clamped in place.<br />

2. Verify that wood cants, blocking, curbs, and nailers are securely anchored to<br />

roof deck at penetrations and terminations and that nailers match thickness of<br />

insulation.<br />

3. Verify that surface plane flatness and fastening of wood roof deck comply<br />

with roofing system manufacturer’s written instructions.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

BUILT-UP ASPHALT ROOFING 07511 - 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!