SECTION 15900 – BUILDING MANAGEMENT AND CONTROL SYSTEM (BMCS)<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Includes all necessary software and materials for a complete and operating system<br />

without additional cost to the owner and as indicated elsewhere in the specification and<br />

shall include the following:<br />

1. Furnishing and installing a complete temperature control and building<br />

management system (BMCS) for the new classroom addition.<br />

a. Local Head End System Workstation (includes feature that provides<br />

functioning as a local Graphic Operator’s Interface) located at the school.<br />

b. All hardware, software and services necessary to seamlessly be<br />

connected through the Wide Area Network (WAN) to a fully implemented<br />

District Level Head End System located at the District Offices.<br />

c. Program the DDC and create the graphic screens.<br />

2. Engineering, programming, checking out and commissioning a complete system<br />

in accordance with design documents and sequences of operation.<br />

3. Furnishing and installing all the required conduit, cable and wire for the entire<br />

system.<br />

4. Mounting and wiring all temperature control and building management devices,<br />

controllers and equipment for a complete system.<br />

5. Creating and installing a complete graphical interface which will include all points<br />

and systems for the entire BMCS.<br />

6. Working with air balance contractor during the balancing phase of the project.<br />

Providing the necessary set points in the VAV controllers needed to do the<br />

pickup calibration. Providing the handheld tool required to modify each individual<br />

VAV box controller. This tool shall remain on the job site for future use by the<br />

District.<br />

7. District training, using job specific Operation and Maintenance Manuals.<br />

8. Documentation - Four hard copies of the Project's Operation and Maintenance<br />

Manuals. Provide CD ROM containing all job documentation (i.e. PDF files of<br />

data sheets, CAD files, DDC Programming etc.) with each O&M Manual.<br />

9. One-year warranty for all labor and equipment for the entire system.<br />

10. All valve operators on valves 2" and smaller are to be direct coupled.<br />

11. All low voltage wire shall be run in conduit where exposed in mechanical areas,<br />

areas not accessible, areas where it may be subject to damage, or areas with a<br />

single point of access requiring crawling in the concealed area. Low voltage wire<br />

may be installed in plenums and other concealed areas where easy and<br />

reasonable access is regularly available. Wire run in plenums and other<br />

concealed areas shall be plenum rated wire and shall meet all NEC and local<br />

code requirements.<br />

12. Furnish and install EBTRON Flow Sensors in all AHUs.<br />

13. Furnish and install CO2 sensors on all AHUs.<br />

B. Related Sections<br />

1. Division 15 - Installing of temperature control valves, thermal wells in pipes, DP<br />

Sensors and flow switches etc.<br />

2. Division 16 - Power provisions as described in Contract Documents.<br />

C. District To Provide -<br />

1. Connection point for District's BMCS LAN Communication (Ethernet).<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION<br />

AUTOMATIC TEMPERATURE CONTROLS 15900-1