jumper. Prior to installation, verify with Architect that the 15 inches is adequate for<br />

the designed movement, and if not, increase this length as required.<br />

G. Conduit stubbed from a concrete slab or wall to serve an outlet under a table or to supply a<br />

machine shall have a rigid conduit coupling flush with the surface of the slab. Provide plug<br />

where conduit is to be used in future.<br />

H. Conduits in above grade slabs shall be located in the middle of the slab. The maximum size,<br />

spacing, and location of conduits in post-tensioned slabs shall be subject to approval by the<br />

structural engineer. Conduits larger than one inch shall not be run in slabs.<br />

I. Provide a ground wire sized per code in all conduit.<br />

J. Where PVC conduit is below building slab on grade, conduit must be installed to be at least 2<br />

inches below the slab. Provide 2 inches of sand or pea sized gravel to cover conduit. Protect<br />

conduit from vehicle traffic and construction traffic prior to concrete pour. Conduit poured<br />

inside the slab for slab on grade construction is not acceptable.<br />

K. Elbows larger than 30 degrees and one inch shall be galvanized rigid conduit, wrapped with<br />

PVC tape.<br />

L. Provide a ground wire sized per code in all PVC conduits. Conductor quantities indicated in<br />

conduits do not include ground wires unless otherwise noted.<br />

M. Provide trenching, backfilling, compaction, re-paving or other site restoration as required by<br />

the work done in this division. Minimum trench depth shall be 24" unless otherwise noted.<br />

N. Install a detectable 6 inch wide yellow vinyl tape with letter "Caution: Buried Electrical Line<br />

Below" 18 inches above all buried service conduit and wire not under structures.<br />

O. Backfill material for all trenches under paved areas shall be coarse sand or crushed rock,<br />

installed in layers not to exceed eight inches and compacted to 95% of maximum density at<br />

optimum moisture content to preclude subsequent settlement. Compaction by water method.<br />

The top 18 inches of trenches in landscaped or grassed areas shall be backfilled with native<br />

soil and tamped.<br />

P. Conduits piercing a building waterproof membrane shall be provided with flanges, using two<br />

neoprene washers, one washer on each side of membrane, between each flange and<br />

membrane.<br />

Q. All underground conduits which enter the building shall be sloped to drain away from the<br />

building and shall be water sealed to prevent moisture from passing through the conduit into<br />

the building. All joints to be threaded and taped or glued to prevent entry of water into the<br />

conduits.<br />

R. All underground conduits entering the building shall be poured-in-place, or provided with<br />

watertight conduit sleeves and rubber seals, Link-seal system by Thunderline Corporation or<br />

equivalent.<br />

S. Raceways shall be left clean and free of debris.<br />

T. Provide a pull string in all empty conduits.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

RACEWAYS 16130-3