10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 15180 - INSULATION<br />

PART 1.00 - GENERAL<br />

WORK INCLUDED:<br />

It is the intent of this section of the specifications that all hot (above 105N F.) and cold (below 55N F) surfaces of<br />

all piping and mechanical system components be insulated, unless specifically excluded herein.<br />

Systems to be insulated:<br />

l. Supply air ductwork<br />

2. Heating hot water and chilled water piping systems<br />

3. Hot and cold domestic water piping systems<br />

4. Refrigerant suction piping systems<br />

5. Water and waste piping below handicapped sinks and lavatories<br />

6. Roof drain piping<br />

The providing of all materials, supplies, equipment, tools, transportation, and facilities and performing all labor<br />

and service necessary to provide the work outlined above and as shown on the working drawings.<br />

PART 2.00 - PRODUCTS<br />

COMPLIANCE:<br />

All insulation shall (as a minimum) conform to the requirements of the building code an have a flame spread<br />

rating of less than 25 and smoke developed less than 50.<br />

Insulation shall be as manufactured by Schuller, Owens-Corning, Knauf, Armstrong, or Certainteed.<br />

HEATING HOT AND CHILLED WATER PIPING, DOMESTIC HOT, COLD, AND HOT WATER<br />

RECIRCULATING PIPING:<br />

All piping shall be insulated with 2-piece heavy density pipe insulation having an average thermal resistivity in<br />

the range of 4.0 to 4.6 Hr Deg. F. Ft2/BTU per inch of thickness on a flat surface at a mean temperature of 75<br />

deg. F. Thickness of insulation shall be as follows:<br />

__________________________________________________________________________________________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

INSULATION 15180-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!