B. Perform no portion of the work requiring submittal and review of the product data until the<br />

electrical engineer and Director of IT Infrastructure have approved the respective submittal.<br />

Such work shall be in accordance with approved submittals.<br />

C. Submit product data sheets as a complete set within thirty (30) days of award of contract<br />

For initial submission and for re-submission required for approval, submit eight (8) copies of<br />

each item. The engineer will not return copies. Make reproductions as required for your use<br />

and distribution to subcontractors<br />

D. General: Submit the following:<br />

1. Bill of materials, noting long lead-time items.<br />

E. Product Data: Provide catalog cut sheets and information for the following:<br />

1. Cabling and optical fiber.<br />

2. Outlets, jacks, faceplates, and connectors.<br />

3. Patch panels required for all terminations both phone and data.<br />

4. Enclosures, racks, horizontal and vertical cable management.<br />

F. Project record drawings:<br />

1. Submit to the District Technology Department, the project record drawings at<br />

conclusion of the project and include.<br />

1.5 QUALITY ASSURANCE<br />

a. As built drawings indicating locations and identification of work area outlets,<br />

nodes, telecommunications rooms (MDF’S/IDF’S), and backbone (riser) cable<br />

runs. This should be provided on disk format (CD) as well as a hard copy.<br />

Provide AutoCAD as-built drawings. Provide AutoCAD as-built drawings. Post a<br />

laminated copy on site within each MDF and IDF.<br />

**Release of payment will not be permitted until drawings are provided.<br />

b. Cross-connect schedules including entrance point, main cross-connects,<br />

intermediate cross-connects, and horizontal cross-connects.<br />

c. Labeling and administration documentation.<br />

d. Warranty documents for equipment.<br />

e. Copper certification test results on CD with appropriate viewing software.<br />

f. Optical fiber power meter/light source test results.<br />

A. The following CERTIFIED INSTALLATION contractors are approved for the work of this<br />

section:<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

TELEPHONE AND DATA DISTRIBUTION 17000-4