10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 17000 – TELEPHONE AND DATA DISTRIBUTION<br />

DIVISION 16000 ELECTRICAL CONTRACTORS ARE RESPONSIBLE TO READ, UNDERSTAND<br />

AND ABIDE TO THE SPECIFICATIONS OF DIVISION 271010 CONTRACTORS RESPONSIBILITY<br />

AND THE SCOPE OF THE WORK THAT IS BEING REQUIRED<br />

DIVISION 16000 ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL PATHWAYS<br />

(CONDUITS, CABLE BASKET TRAYS, WALL OR FLOOR PENETRATIONS, GROUNDING AND<br />

BONDING TO ENABLE DIVISION 271010 CONTRACTOR TO INSTALL TELECOM CABLING<br />

WITHIN THE SCOPE OF THE CONSTRUCTION PROJECT<br />

PART 1-GENERAL<br />

1.1 SUMMARY:<br />

A. Section Includes: Equipment, materials, labor, and services to provide a telephone and data<br />

distribution system including, but not limited to:<br />

REFERENCE: MDF-Main Distribution Frame IDF- Intermediate Data Facilities<br />

1. Telephone and data cabling terminations<br />

2. Optical fiber and terminations<br />

3. Telecommunications faceplates<br />

4. Terminal blocks/cross-connect systems<br />

5. Equipment racks and cabinets<br />

6. System testing<br />

7. Documentation and submissions<br />

8. The District will provide and install all computers and servers.<br />

9. The District is responsible to patch all connections both in the closets and within each<br />

location-the ports to be used will only be patched over, and dressed out within the<br />

closets and locations.<br />

B. Provide all equipment, materials, labor, and services, not specifically mentioned or shown,<br />

which may be necessary to complete or perfect all parts of the installation. Ensure that they<br />

are in compliance with requirements stated or reasonably inferred by the contract documents.<br />

C. Work not included:<br />

1. The following work will be done by others:<br />

a. Off-site services.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

TELEPHONE AND DATA DISTRIBUTION 17000-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!