2.02 MATERIALS<br />

A. Primer/Adhesive: Acrylic based approved by manufacturer of the finish system.<br />

B. Insulation Board: Expanded Polystyrene complying with the requirements of FS-HH-I-524C,<br />

Type 1. Flame spread shall be less than 25 and smoke development shall be less than 450<br />

when tested in accordance with ASTM E-84. Thickness is indicated on the drawings.<br />

C. Standard reinforcing fabric shall be balanced open weave, treated glass fiber mesh, 3.8<br />

ounce per sq. yard.<br />

D. Finish shall be acrylic-based factory mixed materials, intregal color and texture.<br />

E. Cement: Type 1, Portland Cement, ASTM C-150.<br />

F. Water: Potable<br />

G. Sealant: Tremco "Dymeric" with primer #1, Pecora "Dynatrol 11" with Primer P75, or Dow<br />

Insulation Mastic No. 11.<br />

PART 3 - ERECTION<br />

3.01 WEATHER CONDITIONS<br />

A. Ambient air and substrate temperatures shall be 40 degrees F. or greater and rising at the<br />

time of installation and shall remain at least 40 degrees F. for at least 24 hours after<br />

application.<br />

3.02 INSTALLATION - GENERAL<br />

A. Insulation boards shall be applied with joints offset with respect to the substrate joints using a<br />

running bond pattern, with joints at corners staggered and interlocked.<br />

B. Provide temporary protection during installation of system and prior to installation of sealants<br />

and flashing systems.<br />

3.03 PRIMER/ADHESIVE AND INSULATION BOARD<br />

A. Apply 6" wide strips of reinforcing mesh to substrate, after board is applied fold reinforcing<br />

mesh around edge and overlap face sheet with edge strip. Apply primer/adhesive mixture to<br />

entire surface of one face of insulation board using a 3/8" notched trowel. Make sure ribbons<br />

of adhesive are full and reach the outer perimeter of the EPS board.<br />

B. Mount prepared board to substrate, tamp board using even pressure to produce uniform<br />

contact and bond. Allow to cure 24 hours. Install all routed joints.<br />

C. Sand high areas of insulation board to produce a level plane surface.<br />

3.04 BASE COAT AND MESH<br />

A. Apply base coat, 1/16" thick coat of primer/adhesive mixture to the surface of insulation<br />

board. Immediately embed reinforcing fabric into wet primer/adhesive mixture. Fabric shall be<br />

abutted and staggered. Allow to dry 12 hours.<br />

B. Apply 1 layer of base coat over the reinforcing fabric. Allow to dry 24 hours. Wrap reinforcing<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />