10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3 - EXECUTION<br />

A. INSTALLATION<br />

1. Provide factory-trained installers.<br />

2. Apply manufacturers' adhesive behind each board using egg-sized gobs 16" o.c.<br />

3. Locate accessories on each board as specified. Provide mitered and wrapped<br />

hairline joints for all trims. Provide fasteners at perimeter trims 16" - 24” and 12" - 16"<br />

on trays.<br />

a. Mounting heights from the floor: Refer to drawings.<br />

4. Install continuous tack strips at height and location shown on drawings. Glue to wall<br />

with proper adhesive recommended by manufacturer.<br />

5. Coordinate job-site assembled units with grounds, trim, and accessories. Join parts<br />

with a neat, precision fit.<br />

B. ADJUST AND CLEAN<br />

1. Clean boards using manufacturers' recommended procedures and install cleaning<br />

labels for each room.<br />

2. General contractor shall cover and protect all boards after installation and cleaning.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

VISUAL DISPLAY BOARDS 10100 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!