E. Damage: Promptly repair damage caused to adjacent facilities by demolition operations.<br />

1. Do not interrupt existing utilities serving occupied or used facilities, except when<br />

authorized in writing by authorities having jurisdiction. Provide temporary services during<br />

interruptions to existing utilities, as acceptable to governing authorities.<br />

F. Hazardous Materials Removal:<br />

1. When hazardous materials are encountered, notify the General Contractor immediately.<br />

PART 2 - PRODUCTS<br />

Not used.<br />

PART 3 - EXECUTION<br />

3.1 GENERAL<br />

A. Demolition<br />

1. Pollution Controls: Use water sprinkling, temporary enclosures, and other suitable<br />

methods to limit dust and dirt rising and scattering in air to lowest practical level. Comply<br />

with governing regulations pertaining to environmental protection.<br />

a. Do not use water when it may create hazardous or objectionable conditions<br />

such as ice, flooding, and pollution.<br />

b. Clean adjacent structures and improvements of dust, dirt, and debris caused by<br />

demolition operations, as directed by Architect or governing authorities. Return<br />

adjacent areas to condition existing prior to start of work.<br />

B. Coordination with New <strong>Construction</strong>: Coordinate all demolition work with the new work so that<br />

products, materials and systems are removed in a timely fashion to accommodate the installation<br />

of new products, materials and systems.<br />

C. Cutting Concrete: Saw cut concrete slabs with approved saws at lines and levels indicated on<br />

drawings.<br />

D. Capping and Abandonment: Cap all abandoned lines and conduits and drains in accordance with<br />

requirements of Utility Companies having jurisdiction. Remove abandoned lines, unless<br />

otherwise noted.<br />

E. Permits: Contractor is required to obtain a Demolition Permit and Utility Disconnection Permits<br />

from the City and utility companies.<br />

1. Record on Record Document location and extent of all capped and abandoned lines<br />

below grade.<br />

3.2 DISPOSAL OF DEMOLISHED MATERIALS<br />

A. General: remove from site debris, rubbish, and other materials resulting from demolition<br />

operations and dispose in a legal manner.<br />

3.3 BACKFILL<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

DEMOLITION 02050 - 2