10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

flanges of obstructions. Extend carpet under movable furniture and equipment, unless<br />

otherwise indicated.<br />

C. Install carpet edge guard at locations where edge of carpet is exposed to traffic or where floor<br />

covering materials change, except where another device, such as an expansion joint or<br />

threshold is indicated, with integral carpet binder bar or edge guard. Anchor edge guard to<br />

substrate.<br />

3.05 CLEANING AND PROTECTION<br />

A. Refer to Section 01700.<br />

B. Provide the Owner with a manual of instructions for proper care and cleaning of carpet.<br />

C. Remove spots, smears, stains, etc., immediately with a material recommended by carpet<br />

installation.<br />

D. After installation, sweep and vacuum carpet surfaces clean of all foreign material. Neatly<br />

apply minimum 4 mil thick polyethylene film, firmly fastened to carpet surfaces that are subject<br />

to construction traffic.<br />

E. Remnants: At direction of Architect, leave remnants, of sizes indicated, in possession of<br />

Owner.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

CARPET 09680 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!