10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 16425 – SWITCHBOARDS 600 VOLTS & BELOW<br />

PART 1 - GENERAL<br />

1.1 WORK INCLUDED:<br />

A. Furnish and install the service entrance switchboard and distribution switchboards as herein<br />

specified and shown on the associated electrical drawings.<br />

1.2 SUBMITTALS:<br />

A. Submit complete descriptive shop drawings indicating bus arrangement, overcurrent devices,<br />

labeling, dimensions, ratings and other pertinent data.<br />

PART 2 - PRODUCTS<br />

2.1 ACCEPTABLE MANUFACTURERS:<br />

A. Square D, General Electric, Siemens, Cutler-Hammer/Westinghouse<br />

B. Requests for substitution of other products will be considered if submitted in accordance with<br />

Section 01630.<br />

2.2 EQUIPMENT:<br />

A. Each distribution board section shall be free standing and have an open bottom. Top and<br />

bottom conduit area is to be clearly shown and dimensioned on the shop drawings. All front<br />

plates used for mounting meters, selector switches or other front mounted devices shall be<br />

hinged with all wiring installed and laced with flexibility at the hinged side. All closure plates<br />

shall be screw removable and small enough for easy handling by one man. The paint finish<br />

shall be gray enamel over a rust-inhibiting phosphate primer.<br />

B. Overcurrent devices shall be of size and type as indicated on the drawings. Series rated<br />

equipment will not be permitted as a substitute for the interrupting capacities stated on the<br />

one line diagram.<br />

C. Main lugs shall be tool applied compression type if aluminum wire is used. The bus bars<br />

shall be rigidly braced for 100,000 amps and sized as indicated on the drawings.<br />

D. The end section is to have bus bar provisions for future addition of a switchboard section.<br />

The provisions shall include the bus bars installed to the extreme side of the switchboard and<br />

prepunched to facilitate future bolted splice plates.<br />

E. Where fusible switches are indicated, they shall have Class R or L fuse clips. Fusible<br />

switches shall be of the positive, quick-make, quick-break type and external operating handle<br />

shall be suitable for padlocking in the "OFF" position. All units shall be dead front. Provide a<br />

spare fuse cabinet.<br />

F. Current limiting circuit breakers shall interrupt the current flow within a quarter cycle.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

SWITCHBOARDS 600 VOLT & BELOW 16425-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!