10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A. All hardware through bolted to door and stile with theft-resistant, two-way bolt and barrel,<br />

stainless steel machine screws.<br />

PART 3 - EXECUTION<br />

3.01 INSPECTION<br />

A. Check areas scheduled to receive compartments for correct dimensions, plumbness of walls<br />

and soundness of surfaces that would affect installation of mounting brackets.<br />

B. Verify spacing of plumbing fixtures to assure compatibility with installation of compartments.<br />

C. Do not begin installation of compartments until conditions are satisfactory.<br />

3.02 ERECTION<br />

A. General:<br />

1. Install- compartments rigidly, straight, plumb, and level and in accordance with<br />

manufacturer's installation instructions.<br />

2. Installation methods shall conform to manufacturer's recommendations for backing<br />

and proper support.<br />

3. Conceal evidence of drilling, cutting, and fitting to room finish.<br />

4. Maintain uniform clearance at vertical edge of doors.<br />

3.03 ADJUSTMENT AND CLEANING<br />

A. Adjust hardware for proper operation after installation.<br />

B. Set hinges on in-swinging doors to hold doors open approximately 15 degrees from closed<br />

position when unlatched.<br />

C. Set hinges on out-swinging doors to hold unlatched doors in closed position.<br />

D. Clean exposed surfaces of partitions, hardware, fittings.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

SOLID PHENOLIC PLASTIC TOILET COMPARTMENTS 10170 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!