Install each direct-connected motor such that it is securely mounted in accurate alignment. The drive must be<br />

free from both angular and parallel misalignment when both motor and driven machine are operating at normal<br />

temperatures. Provide each belt-connected motor with a securely mounted adjustable base to permit installation<br />

and adjustment of belts.<br />

INSTALLATION OF ABOVE GROUND PIPING:<br />

Provide piping systems of sizes indicated on the drawings. Systems shall be installed complete.<br />

Install piping systems in conformance with ANSI B31.<br />

Install piping to allow for expansion and contraction of the piping systems.<br />

Provide offsets and swing joint connections at coils, pumps and other equipment to eliminate undue strain at the<br />

equipment connections.<br />

1. Connect flanges and tack weld piping systems in place before full circumferential welds are made.<br />

2. Springing of piping at equipment connections will not be permitted.<br />

3. The use of "cold-spring" is not permitted.<br />

Branch connections shall be made at the top or at a 45 degree angle above the centerline.<br />

Install water piping with a pitch or slope of not less than 1-inch in 40 feet.<br />

1. Provide 3/4-inch diameter plugged drain valves at each low point.<br />

High Points: At each high point of the piping system provide a 3/8-inch diameter plugged globe valve.<br />

1. Where high points are located in an inaccessible position, provide a 3/8-inch diameter bleed line from<br />

the high point of the piping system and extend to an approved location, with access. Anchor bleed<br />

piping and provide 3/8-inch diameter globe valve.<br />

Support, anchor, and guide piping systems to preserve piping flexibility and the isolation effects of sound and<br />

vibration isolation hangers.<br />

Conform to the welding and welder qualification requirements paragraph of this Section.<br />

1. Perform welding in conformance with ANSI B31.1.<br />

2. Perform welding in ambient temperatures above 0 degrees F.<br />

3. Ream and clean ends of piping.<br />

4. Support piping, align and tack weld making allowance for pipe pitch and insulation. Temporarily block<br />

piping at hangers.<br />

5. Use welding pipe clamps on piping 4-inch diameter and larger, and verify alignment before welding.<br />

All installed pipe lines shall be straight, free from dents, scars and burrs, with ends reamed smooth and shall<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-27