10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 01400 - TESTING AND LABORATORY SERVICES<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS:<br />

A. Drawings and General Provisions of Contract, including General and Supplementary<br />

Conditions and Division-1 <strong>Specification</strong> sections, apply to work of this section.<br />

1.02 DESCRIPTION:<br />

A. From time to time during the progress of the work, testing is required to be performed to<br />

determine that materials provided for the work meet the specified requirements. Such testing<br />

includes, but is not necessarily limited to fill material for the site, welding, bolting, concrete,<br />

and masonry grout.<br />

1.03 WORK INCLUDED:<br />

A. Selection of Testing Laboratory: The Owner will select a prequalified, independent testing<br />

agency.<br />

B. Payment for Initial Testing Services: The Owner will pay for all initial services of the testing<br />

agency as further described in Part 2 of this Section.<br />

1.04 RELATED WORK SPECIFIED IN OTHER SECTIONS:<br />

A. Requirements for testing are described in various sections of these <strong>Specification</strong>s. Where no<br />

testing requirements are described, but testing is specified, the testing is to be performed<br />

under current recognized standards.<br />

1.05 CODES AND STANDARDS:<br />

A. Testing, when required, will be in accordance with all pertinent codes and regulations, and<br />

with selected standards of the American Society for Testing and Materials.<br />

1.06 QUALIFICATIONS OF TESTING LABORATORY:<br />

A. The testing laboratory will be qualified to the Owner's approval in accordance with ASTM<br />

E-329 "Recommended Practice for Inspection and Testing Agencies for Concrete and Steel<br />

Used in <strong>Construction</strong>".<br />

1. The testing laboratory is only required to have testing facilities for work included in<br />

this project.<br />

2. Testing machines shall have been calibrated at intervals not exceeding 12 months by<br />

devices of accuracy traceable to the National Bureau of Standards.<br />

1.07 PRODUCT HANDLING:<br />

A. Promptly process and distribute all required copies of test reports and related instructions to<br />

ensure all necessary retesting and/or replacement of materials with the least possible delay to<br />

progress of the work.<br />

PART 2 - PRODUCTS<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

TESTING AND LABORATORY SERVICE 01400-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!