The Owner's representative will transmit one copy of the following "Records for Owner" to the CAB firm for<br />

review and comments:<br />

1. Record drawings<br />

2. Approved fixture brochures, wiring diagrams, and control diagrams.<br />

3. Shop drawings<br />

4. Instructions<br />

5. Motor and valve charts<br />

6. Operating and Maintenance Manuals<br />

SERVICES OF MECHANICAL CONTRACTOR:<br />

The mechanical contractor shall have all systems complete, calibrated, and in operational readiness prior to<br />

notifying the CAB firm that the project is ready for their services. The mechanical contractor shall coordinate<br />

system readiness with the system commissioning contractor and shall certify in writing to the Owner's<br />

representative that the system is complete and ready to balance.<br />

SERVICES OF THE CAB FIRM:<br />

The technical CAB firm shall submit biographical data on the individual proposed to directly supervise the CAB<br />

work. It shall also submit their record of specialized experience in the field of air and hydronic system balancing.<br />

Act as liaison between the Owner's representative and contractor and periodically inspect the installation of<br />

mechanical piping systems, sheet metal work, temperature controls and other component parts of the heating,<br />

air conditioning and ventilating systems as the installation progresses. The inspection will cover only those parts<br />

of the systems relating to the checking and balancing.<br />

To check, adjust, and balance system components to obtain optimum conditions in each conditioned space in<br />

the building.<br />

Prepare and submit to the Owner's representative, complete reports on the balance and operations of the<br />

systems.<br />

The CAB firm shall be responsible for inspecting, adjusting, balancing, and logging the data on the performance<br />

of the following general systems, including all components.<br />

1. Heating hot water systems, including boiler, pumps, coils, controls, etc.<br />

2. Chilled water system including air cooled chiller, pumps, compressors, control, etc.<br />

3. Air handling unit, fan, dampers, heating hot water and chilled water coils, etc.<br />

4. Temperature control system in its entirety includes the verification of all control sequences and safety<br />

devices.<br />

5. Relief air systems, dampers, sensors, etc.<br />

6. Air distribution systems.<br />

Before any adjustments are made, the air systems are to be checked for such items as correct placement of<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

BALANCING 15043-2