SECTION 05400 - COLD-FORMED METAL FRAMING<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. Drawings and general provisions of Contract, including General and Supplementary<br />

Conditions and Division-1 <strong>Specification</strong> sections, apply to work of this section.<br />

1.02 SUMMARY<br />

A. Work in this section includes, but is not limited to:<br />

1. "C" shaped load-bearing steel studs.<br />

2. Wall and soffit sheathing.<br />

3. Heavy duty furring channels at aluminum composite system<br />

B. Related Sections:<br />

1. Division 5 Section “Structural Steel.”<br />

2. Division 7 Section “Exterior Insulation and Finish Systems” for soffit finishes.<br />

3. Division 7 Section “Composite Panels.”<br />

4. Division 7 Section “Polyvinyl-Chloride (PVC) Roofing).<br />

1.03 SUBMITTALS<br />

A. General: Submit the following in accordance with Conditions of Contract and Division 1<br />

<strong>Specification</strong> Sections.<br />

B. Product Data: Submit manufacturer's product information and installation instructions for each<br />

item of cold-formed metal framing, sheathing and accessories.<br />

C. Certificates: Submit manufacturer’s written certification that sheathing products meet<br />

specified requirements.<br />

1.04 QUALITY ASSURANCE<br />

A. Component Design: Calculate structural properties of studs and joists in accordance with<br />

American Iron and Steel Institute (AISI) "<strong>Specification</strong> for Design of Cold-Formed Steel<br />

Structural Members".<br />

B. Welding: Use qualified welders and comply with American Welding Society (AWS) D1.3,<br />

"Structural Welding Code - Sheet Steel".<br />

C. Pre-Installation Conference: Prior to start of installation of metal framing systems, meet at<br />

project site with installers of other work including door and window frames and mechanical<br />

and electrical work. Review areas of potential interference and conflicts, and coordinate<br />

layout and support provisions for interfacing work.<br />

D. Fire-resistance ratings: Where applicable, provide materials and construction that are<br />

identical to those of assemblies whose fire-resistance ratings are indicated.<br />

1.05 DELIVERY, STORAGE AND HANDLING<br />

A. Deliver materials to the job site in manufacturer’s original packaging, containers and bundles<br />

with manufacturer’s brand name and identification intact and legible.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

COLD-FORMED METAL FRAMING 05400 - 1