On chalky and loose insulation, soft, porous, fiber-filled or fiberglass coverings, a spiral wrap of pipe banding<br />

tape shall be made around the circumference of the pipe. Sufficient spiral wraps shall be made to accommodate<br />

the horizontal dimension of the pipe marker.<br />

On bare pipes, painted pipes, and pipes insulated with a firm covering, pipe banding tape matching the<br />

background color of the marker shall be used for 360 deg. color coding. After applying pipe markers, wrap pipe<br />

banding tape around pipe at each end of marker. Tape should cover 1/4" to 1/2" of each end of marker, and<br />

should overlap approximately 1/2" to 1" on itself. Be sure pipe surface is dry and free of dirt or grease before<br />

applying markers or banding tape.<br />

Stenciling may be used in lieu of the above labels and markers if finished application gives the same overall<br />

appearance, that is that stenciling is applied over a background color. If stenciling is used, letter heights,<br />

background colors, banding, and arrow shall be as specified above. Submit sample to Owner's representative<br />

before proceeding with work.<br />

Ceiling Markers:<br />

Use round color coded stickers on all accessible ceiling grid to indicate location of valves and dampers.<br />

Color code as follows: Yellow HVAC<br />

Green Plumbing<br />

Blue Air<br />

White Duct valves<br />

Orange Electrical devices<br />

Red Fire<br />

PART 3.00 - EXECUTION<br />

COORDINATION:<br />

All equipment and piping shall be arranged to allow for easy maintenance and access to service valves.<br />

Provide valves and unions or flanges at all pieces of equipment to allow maintenance.<br />

Install all automatic valves, sensor well, flow switches, etc., as directed by the control contractor.<br />

TESTING:<br />

All piping shall be tested in accordance with Section 15042 prior to applying insulation or concealing in partitions,<br />

wall, etc.<br />

ACCESS:<br />

All valves and equipment shall be located to allow easy access for inspection, service and maintenance, test and<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-25