10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. Accessories:<br />

1. Reinforced wire: Minimum tensile strength of 75,000 psi.<br />

2. Tie wire: 9 gage annealed steel, galvanized.<br />

D. Gates: Swing type as shown on the drawings. Gate fabric and frame same as fence. Hinges<br />

to be pressed steel or malleable iron to suite gate size, non lift-off type. Provide forked type or<br />

plunger type latch with integral padlock eye.<br />

E. Temporary fencing to be galvanized steel pipe post and mesh, with temporary support.<br />

PART 3 - EXECUTION<br />

3.01 EXAMINATION<br />

A. Examine all subsurfaces to receive work and report, in writing, to the Architect any conditions<br />

detrimental to the work. Failure to observe this injunction constitutes a waiver to any<br />

subsequent claims to the contrary. Commencement of work will be construed as acceptance<br />

of all subsurfaces.<br />

3.02 INSTALLATION<br />

A. Fence shall be installed on previously prepared surfaces to line and grade indicated. Comply<br />

with fence manufacturer's instructions and as specified below.<br />

B. Post holes shall be of dimensions indicated, and cleared of loose materials. Set posts plumb<br />

and in alignment. Posts shall be set in concrete bases of dimensions indicated. Thoroughly<br />

compact concrete so as to be free of voids and pockets. Allow concrete to cure at least 72<br />

hours before proceeding with installation of fabric.<br />

C. Provide post caps of the type recommended by the fence manufacturer.<br />

D. Fabric shall be pulled taut and secured to top and bottom rail, to both sides of each post and<br />

at intervals not greater than 24" on centers. Fasten to end posts with stretcher bars.<br />

E. Gates shall be installed to swing freely. Furnish and install all required materials related to<br />

ensure smooth action and stability.<br />

3.03 CLEANUP<br />

A. Refer to Division 1 Section “Contract Closeout.”<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

FENCES AND GATES 02830 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!