3) The Contractor shall make neat and legible notations on the record drawings<br />

progress sheets daily as the work proceeds, showing the work as actually<br />

installed. For example, should a piece of equipment be installed in a<br />

location that does not match the plan, the Contractor must indicate that<br />

equipment has been relocated in a graphic manner so as to match the<br />

original symbols as indicated in the irrigation legend. The relocated<br />

equipment and dimensions will then be transferred to the original record<br />

drawing plan at the proper time.<br />

4) Before the date of the final inspection, the Contractor shall transfer all<br />

information from the "as-built" prints to an ozalid sepia, procured from the<br />

Owner's Authorized Representative. All work shall be in waterproof India ink and<br />

applied to the mylar by a technical pen made expressly for use on mylar material.<br />

Such pen shall be similar to those manufactured by Rapidograph, Kueffell & Esser, or<br />

Faber Castell. The dimensions shall be made so as to be easily readable even on<br />

the final controller chart (see Section ?). The original mylar "record drawing" plan<br />

shall be submitted to the Owner's Authorized Representative for approval of prior to<br />

fabricating the controller chart.<br />

5) The Contractor shall dimension from two (2) permanent points of reference,<br />

building corners, sidewalk or road intersections, etc., the location of the<br />

following items:<br />

a. Connection to existing water lines.<br />

b. Connection to existing electrical power.<br />

c. Gate valves.<br />

d. Routing of sprinkler pressure lines (dimensions max. 100' along<br />

routing).<br />

e. Electric control valves.<br />

f. Routing of control wiring.<br />

g. Quick coupling valves.<br />

h. Other related equipment as directed by the Owner's Authorized<br />

Representative.<br />

6) On or before the date of the final inspection, the Contractor shall deliver the<br />

corrected and completed sepias to the Owner's Authorized Representative.<br />

Delivery of the sepias will not relieve the Contractor of the responsibility of furnishing<br />

required information that may be omitted from the prints.<br />

C. Equipment to be Furnished:<br />

1) Supply as part of this contract the following:<br />

a. Two (2) keys for each controller.<br />

2) The above mentioned equipment shall be turned over to the Owner at the<br />

conclusion of the project. Before final observation can occur, evidence that<br />

the Owner has received these items must be shown to the Owner's<br />

Authorized Representative.<br />

1.05 PRODUCT DELIVERY, STORAGE AND HANDLING<br />

A. Handling of PVC Pipe and Fittings:<br />

The Contractor is cautioned to exercise care in handling, loading, unloading, and<br />

storing of PVC pipe and fittings. All PVC pipe shall be transported in a vehicle which<br />

allows the length of pipe to lie flat so as not to subject it to undue bending or<br />

concentrated external load at any point. Any section of pipe that has been dented or<br />

damaged will be discarded and, if installed, shall be replaced with new piping.<br />

________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

UNDERGROUND IRRIGATION SYSTEMS 02810-3