PROTECTION AGAINST THE ELEMENTS:<br />

The contractor shall, at all times, take reasonable and adequate precautions to protect his work and all stored<br />

materials and equipment from damage by the elements, including flooding, windstorms, etc., and shall not<br />

expose the work of any other contractor to such damage.<br />

EXPANSION LOOPS:<br />

General: Provide expansion loops or offsets where indicated on the drawings or where required to relieve<br />

excessive stress in piping systems.<br />

<strong>Construction</strong>: Construct loops and offsets with pipe and long turn factory-made welded fittings sized to limit the<br />

stress in any part of the loop or piping system to the values in ANSI B31.1. Use ASTM A 53 pipe and fittings.<br />

Size expansion loops without cold spring.<br />

Provide two pipe guides, one on each side of each loop, and anchor to the building construction.<br />

INSTALLATION OF PUMPS:<br />

General: Install pumps where indicated and in accordance with manufacturer's published installation<br />

instructions.<br />

Support: Install floor mounted pumps on minimum of 4-inch high concrete base. Provide anchor bolt inserts<br />

poured in place. Pumps shall be mounted with cap screws. Grout pump base level.<br />

____________________________________________________________________________________________________________________________________________________________________________________<br />

____<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

HEATING-COOLING 15700-22