3. Valves.<br />

4. Valve boxes and appurtenances.<br />

5. Pipes.<br />

6. Disinfection reports and practices<br />

7. Product Data: Submit manufacturer's technical product data and installation instructions<br />

for fire water system materials and products.<br />

8. Maintenance Data: Submit maintenance data and parts lists for fire water system materials<br />

and products. Include this data, product data, shop drawings, and record drawings in<br />

maintenance manual.<br />

B. Shop Drawings: For the following:<br />

1. Thrust Blocks: Include plans, elevations, sections, details, and forces for thrust blocks for<br />

each size of pipe and type of bend.<br />

C. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same<br />

trench and clearances from storm drainage system piping and sewer system piping. Indicate<br />

interface and spatial relationship between piping and proximate structures.<br />

D. Profile Drawings: Show system piping in elevation. Draw profiles at horizontal scale of not less<br />

than 1 inch equals 50 feet and vertical scale of not less than 1 inch equals 5 feet. Indicate<br />

manholes and piping. Show types, sizes, materials, and elevations of other utilities crossing<br />

system piping.<br />

E. Field quality-control test reports.<br />

1.6 DELIVERY, STORAGE, AND HANDLING<br />

A. Do not store plastic pipe, and fittings in direct sunlight.<br />

B. Protect pipe, pipe fittings, and seals from dirt and damage.<br />

1.7 PROJECT CONDITIONS<br />

A. Interruption of Water Service: Do not interrupt service to facilities occupied by Owner or others<br />

unless permitted under the following conditions and then only after arranging to provide<br />

temporary service according to requirements indicated:<br />

1. Notify Architect, <strong>Construction</strong> Manager, and Owner no fewer than two days in advance of<br />

proposed interruption of service. Coordinate interruptions during weekly meetings and at<br />

pre-construction meeting.<br />

2. Do not precede with interruption of service without Architect's, <strong>Construction</strong> Manager's,<br />

and Owner's written permission.<br />

PART 2 - PRODUCTS<br />

2.1 IDENTIFICATION<br />

A. Underground –Type Plastic Line Markers: Manufacturer's standard permanent, bright-colored,<br />

continuous-printed plastic tape, intended for direct-burial service; not less than 6" wide x 4 mils<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

WATER UTILITY PIPING 02008 - 2