1.08 WATER<br />

beyond the contract limits shall be immediately cleaned up and removed from the area.<br />

A. Water is available at the project site. Coordinate with the Owner’s maintenance personnel for<br />

access. Provide hoses, valves, etc. required for access.<br />

1.09 POWER<br />

A. Power will be provided by the CMGC through arrangements made with the Owner.<br />

1.10 HEATING AND COOLING<br />

A. Temporary heating and cooling required for construction and operation of the facility until<br />

acceptance of the Owner shall be paid by the Contractor. Coordinate with Division 15, to<br />

ensure proper operation and timely start up. Repair or replace damaged or worn items at no<br />

additional cost to the Owner.<br />

PART 2 - PRODUCTS (Not Applicable)<br />

PART 3 - EXECUTION (Not Applicable)<br />

END OF SECTION<br />

!<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01500-2