sealed watertight with flexible waterproof silicone caulking. Seal around sleeves and pipe in sleeves to make<br />

watertight.<br />

PIPE LOCATION AND ARRANGEMENT:<br />

Under no circumstances shall plastic piping or ducting materials be run inside of supply or return air plenums.<br />

No water supply piping inside the building shall be placed in direct contact with the earth. Buried water piping<br />

shall be placed in split tile or PVC pipe to keep pipe from direct contact with ground.<br />

Unless otherwise noted on the drawings, all water piping shall be kept out of concrete floor slabs.<br />

All piping shall be properly racked and supported to run straight and true.<br />

All changes in direction shall be made with approved fittings. Pipes shall not be bent to change direction.<br />

All piping shall be racked and run to facilitate maintenance work. Under no circumstances shall valves, shock<br />

absorbers, drip traps, or piping specialties be installed in a "closed space" without proper access provided for<br />

future maintenance. See "Access Doors" section of specifications.<br />

NOTE: All piping shall be capped or plugged at the end of each work shift and when not being<br />

extended, to prevent the entry of rocks and debris.<br />

Any time lines are broken or disconnected, they shall be capped immediately after flushing to remove rock and<br />

debris from pipes. If rocks or other foreign materials are found in the system after it has been closed, the<br />

contractor shall stand the expense of their removal.<br />

All valves, piping, and equipment to be installed so as to permit disassembly for maintenance purposes.<br />

Provide drain valves at all low points in piping systems. Run to floor drain where possible, otherwise provide 3/4"<br />

hose connections.<br />

PIPE JOINING:<br />

All steel pipe under 2" in size shall be joined by screwed connections. Heating hot water, chilled water,<br />

condenser water, glycol, and oil piping may be welded if pipe size is over 2" in size.<br />

Welded ends shall be plain beveled. Welding fittings must be employed if welding is used. Small (1-1/2" and<br />

smaller) branch connections may be made with Weldolets or Thredolets provided the main is at least 2"<br />

diameter, and not less than two pipe sizes larger than the branch. Where these connections are used, the pipe<br />

opening in the main shall be cut to insure a full inside pipe diameter at the branch connection. Slag and spelter<br />

resulting from the hole cutting shall be removed from the main piping.<br />

All joinings shall be made to maintain the full metal strength of the pipe, with neat and workmanlike appearance.<br />

All piping must be perfectly clean before the system is filled.<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-3