seismic restraints have been installed per manufacturer's instructions and applicable codes and<br />

standards.<br />

CHEMICAL CLEANING:<br />

Prior to operating any heating systems, all piping systems and components shall be chemically cleaned and<br />

flushed by an experienced chemical cleaning service approved by the owner's representative.<br />

Pipe Exterior: Wash and wipe pipe exterior to remove construction dirt, loose scale and flux.<br />

Pipe Interior: Flush pipe interior with clean water. Continue flushing until the piping system runs clean. After<br />

flushing inspect strainer screens, refrigeration machine water boxes, piping low points, and tank drains to<br />

determine the presence of construction debris. If debris is found, disassemble equipment and remove debris.<br />

Reflush the system and re-inspect.<br />

Do not operate centrifugal pumps until system has been cleaned and flushed.<br />

Provide written certification of the chemical cleaning with dates, duration, and chemical concentrations used.<br />

GLYCOL FILL SYSTEMS:<br />

Furnish and install the glycol fill system detailed on the drawings.<br />

The fill system shall be complete with 30 gallon translucent polypropylene tank with cover, high pressure<br />

metering pump with controls, liquid level alarm sensors to sound local alarm on high -or- low tank level and<br />

prevent pump operation on low liquid level.<br />

Controls shall cycle on feed pump when system pressure falls below low pressure set point and shall cycle off<br />

when system pressure exceeds high pressure set point.<br />

Provide operating controls for glycol feed unit on the heating water system.<br />

Provide (1) hand pump to owner for transfer of glycol from drums to tank.<br />

Electrical contractor to provide a 110 volt duplex outlet for glycol feed and reclaim systems and a 110 volt duplex<br />

outlet for each receptor pump. Wiring of system and associated conduit to be by Division 15000. Control<br />

contractor to provide and install all conduit and wiring for all low voltage wiring. All control wiring to be in<br />

conformance with NEC and Division 16. 3/4" conduit minimum.<br />

System shall be Power Engineering, Alpine Technical Services, West Chemical, or Pulsafeeder.<br />

GLYCOL FILL:<br />

This contractor shall furnish all propylene glycol solution for the chilled water system to provide a 30% volumetric<br />

concentration. Glycol solution shall be Dowfrost HD or Jeffcool P150 low toxicity polypropylene with extra<br />

strength corrosion inhibitors and colored dye for identification. This contractor shall provide 30 gallons of 30%<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-20