1.2 SUBMITTALS<br />

A. Product Data - Manufacturer's original catalog data and descriptive information on each<br />

piece of equipment to be used.<br />

B. Shop Drawings<br />

1. Control diagram for each major and/or minor mechanical and electrical system to<br />

be monitored and controlled. Diagrams will show locations of control and<br />

operational components and devices. ATC diagrams will be generated using<br />

AutoCAD or similar software package drawn on 11 "Xl 7" or larger sheets.<br />

2. Ladder and wiring diagram for each controller.<br />

3. Ladder and wiring diagram for overall control system.<br />

4. Graphics penetration path in block diagram form.<br />

5. Software control schematics which accomplishes each "Sequence of Operation".<br />

6. Full and complete As-Built Drawings must be submitted and approved before<br />

final payment can be made.<br />

C. Closeout<br />

1. Operations And Maintenance Manual Data -<br />

a. Requirements are as follows -<br />

1) Provide operating and maintenance instructions for each item of<br />

equipment submitted under Product Data.<br />

2) Include copy of approved shop drawings.<br />

3) Provide all documentation hard copy and in digital format on CD<br />

format<br />

1.3 QUALITY ASSURANCE<br />

A. Pre-Installation Meeting - Schedule meeting with Division 16 and Division 15 installation<br />

contractors before installation of system begins.<br />

1.3 SCHEDULING<br />

A. Coordination<br />

Coordinate planning and installation of equipment with parties specified to be<br />

involved in BMCS including but not limited to:<br />

a. BMCS Contractor<br />

b. Electrical Subcontractor<br />

c. Mechanical Subcontractor<br />

d. District<br />

e. Architect and Consultants<br />

f. Balancing Subcontractor<br />

PART 2 - PRODUCTS<br />

2.1 COMPONENTS<br />

A. The following is a list of approved component manufacturer's:<br />

Work Station -<br />

a. Processor -Intel Pentium IV<br />

b. 512 Meg RAM<br />

c. R/W CDROM<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION<br />

AUTOMATIC TEMPERATURE CONTROLS 15900-2