B. Broad Band Amplifier: Blonder Tongue, RMDA 750-30P, Qty: 2<br />

C. Shelf: Atlas, SH-15-3, Qty: 1<br />

D. VCD/DVD Player: Panasonic, DM REZ 48VK, Qty: 1<br />

E. Equipment rack: Atlas, 61”, FMA35-255A, Qty: 1<br />

F. Rack Panels: Marshal Industries, RP, Qty: As required<br />

G. Splitters, Tapes, Plates, Connectors, Patch Cables: Marshal Industries, Misc., Qty: As<br />

required for complete operating system<br />

H. Surge Protection: Surgex, SX2120, Qty: 1<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION:<br />

A. Main cable runs shall be installed in corridors for ease of future access.<br />

B. Do not use cable tray as a raceway. Cable tray is dedicated to voice and data cables. Video<br />

cables shall be kept a minimum of 6" from data cables.<br />

3.2 TESTING:<br />

A. The contractor shall, after the system is installed and adjusted, notify the owner to arrange for<br />

an acceptance test at a mutually convenient time.<br />

B. The contractor shall prove that reception quality at any outlets selected by the owner (or his<br />

authorized representative) is equal to or better than reception normally available in the area<br />

and that signal strength is as specified.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

TELEVISION SYSTEMS 16780-3