SECTION 07410 - PRE-FORMED METAL PANELS<br />

PART 1 - GENERAL<br />

1.01 DESCRIPTION OF WORK<br />

A. Provide all un-insulated metal wall and soffit panels as shown and noted on drawings.<br />

1.02 RELATED WORK SPECIFIED ELSEWHERE<br />

A. Primary and secondary structural steel.<br />

B. Division 7 Section “Manufactured Roof Panels” for metal roofing<br />

1.03 QUALITY ASSURANCE<br />

A. Manufacturer and erector shall demonstrate a minimum of five years of related industry<br />

experience.<br />

B. Profile and gauges of panels shall beet a wind load of 70 MPH for panels without exceeding a<br />

deflection of L/180.<br />

1.04 SUBMITTALS<br />

A. No less than ten days prior to bid date, submit all independent laboratory test reports, design<br />

and performance data as specified.<br />

B. Prior to fabrication, submit erection/shop drawings for products specified, showing all erection<br />

procedures and accessories required.<br />

C. Refer to Section 01300.<br />

PART 2 - PRODUCTS<br />

2.01 MATERIALS<br />

A. Manufacturer: MBCI (or approved equal).<br />

B. 22 gauge 2 1/2" corrugated metal panel.<br />

1. Finish to conform to Signature 300. Color selected by architect from manufacturer<br />

standard colors.<br />

C. The flashing and trim shall be of the same material, gauge, finish and color(s) as the panels,<br />

unless otherwise indicated.<br />

D. Accessories:<br />

1. Provide all required trim and closures for a complete and weathertight finish.<br />

2. Provide all required fastening devices as required.<br />

E. Accessories:<br />

1. Fasteners: #14 diameter pre-painted self drillers.<br />

2. Tape Sealant: A non-hardening shall be installed at all roof side laps and wall side<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

PRE-FORMED METAL PANELS 07410 - 1