D. Metal Closure Strips: Fabricate metal closure strips for openings between decking and other<br />

construction, of not less than 0.045" minimum (18-gauge) sheet steel. Form to provide tight<br />

fitting closures at open ends of flutes and sides of decking where required for concrete floors.<br />

PART 3 - EXECUTION<br />

3.01 INSPECTION<br />

A. Installer must examine areas and conditions under which metal decking is to be installed, and<br />

notify Contractor of conditions detrimental to proper and timely completion of work. Do not<br />

proceed with work until unsatisfactory conditions have been corrected in a manner<br />

acceptable to Installer.<br />

B. Contractor to provide written inspection and certification of all welds prior to installation of<br />

roofing system.<br />

3.02 INSTALLATION<br />

A. General: Install deck units and accessories in accordance with manufacturer's<br />

recommendations, shop drawings and as specified herein.<br />

B. Place deck units on supporting steel framework and adjust to final position with ends<br />

accurately aligned and bearing on supporting members before permanently fastened. Do not<br />

stretch or contract side lap interlocks.<br />

C. Place deck units flat and square, secure to adjacent framing without warp or excessive<br />

deflection.<br />

D. Coordinate and cooperate with structural steel erector in locating decking bundles to prevent<br />

overloading of structural members.<br />

E. Do not place deck units on concrete supporting structure until concrete has cured and is dry.<br />

F. Cutting and Fitting: Cut and neatly fit deck units and accessories around other work<br />

projecting through or adjacent to the decking, as shown.<br />

G. Reinforcement at Openings: Provide additional metal reinforcement and closure pieces as<br />

required for strength, continuity of decking, and support of other work shown.<br />

H. Hanger Slots or Clips: Provide manufacturer's standard hanger attachment devices.<br />

I. Welding:<br />

1. Weld to all supports perpendicular to corrugations with seven 3/4" diameter minimum<br />

fusion welds per sheet (36" wide sheet).<br />

2. Weld to all supports parallel to corrugations with 3/4" diameter minimum fusion welds<br />

at 12" o.c.<br />

3. Weld all interlocking side seams between adjacent pieces of deck as follows: 1-1/2"<br />

long top seam welds at 24" o.c. If VSC Punch Lock System is used, follow Verco<br />

requirements and spacing shown on the drawings.<br />

J. Closure Strips: Provide metal closure strips at open uncovered ends and edges of roof<br />

decking, and in voids between decking and other construction. Weld into position to provide a<br />

complete decking installation.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

STEEL DECK 05300 - 3