PART 3 - EXECUTION<br />

3.01 INSPECTION<br />

laps of office area.<br />

A. The installer shall examine the building to verify that the structure is ready for installation.<br />

B. All structural supports shall be in place and all sag rods, diagonal bracing and connections<br />

shall be tightened before work proceeds.<br />

C. Field check dimensions and check support alignment with a taut string or wire; support<br />

misalignment will cause panel "oil-canning".<br />

D. Do not proceed until unsatisfactory conditions are corrected.<br />

3.02 INSTALLATION AND ERECTION<br />

A. Install metal panels, fasteners, trim, and related items in conformance with approved<br />

drawings.<br />

B. Protect installed panels from abuse by other trades. The general contractor shall be<br />

responsible for protecting the panels from wet cement, plaster, painting operations, etc.<br />

3.03 DAMAGED MATERIAL AND CLEANING<br />

A. Replace damaged panels and other components of work which cannot be repaired by finish<br />

touch-up or similar minor repair.<br />

B. To prevent rust staining, remove immediately from finished surfaces any filings caused by<br />

drilling or cutting.<br />

C. Wipe down each area after erection is complete for final acceptance.<br />

D. Refer to Section 01700.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

PRE-FORMED METAL PANELS 07410 - 2