alance, and operation. If valves are installed in inaccessible locations it shall be this contractor's responsibility<br />

to furnish and install access doors of a type approved by the owner's representative.<br />

Locate piping, valves, etc., to allow easy access to and maintenance of equipment. Do not block walkways, filter<br />

access, maintenance access, or tube-pull space in equipment rooms.<br />

LOCATIONS & ARRANGEMENTS:<br />

All pressure gages shall be so installed as to be easily readable from an eye level 5' -6" above the floor.<br />

Test plugs on flow measuring stations shall be unobstructed, and shall be arranged in the piping per<br />

manufacturer's recommendations.<br />

All equipment and accessories shall be installed to facilitate proper service and maintenance in compliance with<br />

the manufacturer's recommendations.<br />

WIRING BY THE ELECTRICAL CONTRACTOR:<br />

It is the intent of these specifications that all line voltage electrical power and control wiring, and power<br />

connections to equipment, be furnished and installed by the electrical contractor unless otherwise specified or<br />

shown on the mechanical drawings.<br />

The mechanical contractor shall coordinate actual job-site power requirements of mechanical equipment being<br />

furnished by him with the electrical contractor prior to installation of power wiring and electrical equipment.<br />

The electrical contractor shall provide necessary wiring to electric heat tape as required, and shall coordinate<br />

with the mechanical contractor the location and capacity of required circuits.<br />

When mechanical system components are furnished with remote mounted control panels, alarm bells,<br />

alternators, etc. the electrical contractor shall run all required line voltage (power and control) wiring as directed<br />

by the mechanical contractor. It shall be the mechanical contractor's responsibility to coordinate the work and<br />

provide the necessary wiring diagrams.<br />

When exhaust fans are provided which are not controlled by the ATC contractor, they shall be wired by the<br />

electrical contractor to local line voltage wall switches. The wall switch locations shall be coordinated with the<br />

owner's representative.<br />

STORAGE AND INSTALLATION OF MOTORS:<br />

Handle motors carefully to prevent damage, denting and scoring. Do not install damaged motors or<br />

components; replace with new.<br />

Store motors and components in a clean, dry place. Protect from weather, dirt, water, construction debris, and<br />

physical damage.<br />

Install motors where indicated on the drawings and in accordance with manufacturer's drawings and in<br />

accordance with manufacturer's published installation instructions.<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-26