HANGERS AND SUPPORTS:<br />

General:<br />

All piping shall, as a minimum standard of performance, be supported per MSS SP-69, and generally as follows:<br />

Vertical Piping:<br />

Attachment - Vertical piping shall be secured at sufficiently close intervals to keep the pipe in alignment and to<br />

carry the full weight of the pipe and contents. Stacks shall be supported at their bases, and if over two (2) stories<br />

in height at each floor by approved metal floor clamps.<br />

Cast iron soil pipe shall be supported at not less than each story height and at its base.<br />

Screwed pipe (IPS) shall be supported at not less than every other story height.<br />

Copper tubing shall be supported at each story for piping one and one-half (1-1/2) inches in diameter and at not<br />

more than six (6) foot intervals for piping one and one-quarter (1-1/4) inches in diameter and smaller. Piping<br />

shall be wrapped with three wraps of vinyl tape to isolate pipe from ferrous pipe supports.<br />

Horizontal Piping:<br />

Supports - Horizontal piping shall be supported at sufficiently close intervals to keep it in alignment, prevent<br />

sagging, and to insure that the weight of the piping system is not transferred to equipment connections.<br />

Cast Iron Soil Pipe - Where joints occur, soil pipe shall be supported at not more than 5-foot intervals, except<br />

that where 10-foot pipe lengths are used, supports at 10-foot intervals are acceptable. Supports shall be placed<br />

within eighteen (18) inches of the hub or joint. No-hub joints and fittings shall be restrained with rods and clamps<br />

where required per manufacturer's recommendations.<br />

Screwed pipe (IPS) shall be supported at approximately 12-foot intervals.<br />

Copper tubing shall be supported at approximately 6-foot intervals for piping one and one-half inches and<br />

smaller in diameter and at 10-foot intervals for piping two inches and larger in diameter.<br />

Hangers shall be MSS-69 Type-1 for both bare and insulated pipe. Hangers shall be over-sized where required<br />

to accommodate insulation saddles and shields.<br />

Where roller type supports are used, they shall be MSS-69 Type-43 chair type or suspension type, as required.<br />

(Provide carbon steel pipe saddles on insulated pipes).<br />

Where piping is run adjacent to walls or steel columns, it shall be supported from steel brackets or vertical<br />

channel hangers. Channel systems shall be approved for each condition on an individual basis.<br />

Furnish all hangers, inserts, brackets, anchors, guides, sliding supports, etc., and all auxiliary steel necessary for<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-8