Approved sealer equal to "Hard Cast" shall be applied to the coupling and fittings. Sealer is applied to the<br />

outside of the joint, extending 1 inch on each side of the joint bead and covering all screw heads. Plastic<br />

backed tape is immediately applied over the wet sealer.<br />

The duct sealer must be specifically formulated for the job sealing the field joints for high-pressure systems.<br />

The sealer shall be compatible with plastic-backed duct tape so the two shall cure and bond together.<br />

Samples of sealer and tape and the specification data sheets shall be submitted to the Owner's<br />

representative for approval.<br />

Flanged joints shall be sealed by Neoprene Rubber Gaskets.<br />

ACCESS DOORS AND PANELS:<br />

Location: Provide access doors in casings, plenums, and ducts where shown on the drawings and where<br />

specified for ready access to operating parts including fire dampers, smoke dampers, valves, and concealed<br />

coils.<br />

Pressure Clarification: Construct and install access doors in accordance with SMACNA Standards to suit<br />

the static pressure classifications and the locations where installed.<br />

Access Doors in Ducts: Provide and size doors as follows:<br />

1. Minimum 24-inch by 24-inch clear opening.<br />

2. When field conditions require an access opening smaller than 16-inch by 12-inch, provide a 24-inch<br />

long removable section of casing or duct, secured with quick acting locking devices, 6 inches on<br />

centers, to permit ready access without dismantling other equipment.<br />

Door Requirements: Provide doors in casings and duct as follows:<br />

1. Arrange doors so that system air pressure will assist closure and prevent opening when the system<br />

is in operation.<br />

2. Coordinate doors and equipment to provide unrestricted passage through clear door opening,<br />

without removal of any equipment.<br />

3. Where pressure regulating dampers are installed in ducts or plenums, provide access doors with a<br />

clear wire glass observation port, 6-inch by 6-inch minimum size. Anchor port with structural metal<br />

frame, resilient gaskets and stainless steel bolts.<br />

4. Hinges for doors in zinc coated or aluminum construction shall be steel or iron, zinc coated with<br />

brass pins.<br />

5. Hinges for doors in copper, copper nickel alloy construction shall be all brass.<br />

CLOSURE COLLARS:<br />

A duct ending at a wall or partition shall have the edge turned back to form a closure collar and flanged tight<br />

to the wall or partition so that no sharp or ragged edge appears.<br />

FLASHING:<br />

-<br />

___________________________________________________________________________________<br />

____________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

AIR DISTRIBUTION 15800 - 2