adequacy of adhesion or embedment by visual observation, as judged by the<br />

Architect or Inspector.<br />

a. If sample unit is judged to exhibit less than 70 percent minimum<br />

adhesion or embedment of the materials surface area, adjacent<br />

insulation units will be removed by the same method until it can be<br />

demonstrated that minimum adhesion is consistently being<br />

achieved.<br />

b. De-lamination of insulation surface does not constitute failure of<br />

adhesion, but is rather a demonstration thereof.<br />

c. Adhesions and/or embedment are defined as the process of<br />

pressing a felt, aggregate, fabric, mat, or panel uniformly, and<br />

completely into hot bitumen or adhesive to ensure intimate contact<br />

between materials at all points within limits indicated.<br />

2. Testing by Sample Test Cuts: It is the Owner’s intent to avoid destructive<br />

testing of the completed roof membranes, but the right is reserved to conduct<br />

testing when conditions of installation give cause to question the integrity of<br />

the installation.<br />

a. If sampling reveals non-compliance with requirements, Contractor<br />

shall be responsible for payment of costs to make corrections and<br />

repair test sampling.<br />

b. If sampling reveals compliance with requirements, Owner will pay<br />

cost of test sampling at the rate of $100 per cut, including initial<br />

sampling and subsequent repairs by the Contractor.<br />

3.09 PROTECTING AND CLEANING<br />

A. Protect roofing system from damage and wear during remainder of construction<br />

period. When remaining construction will not affect or endanger roofing, inspect<br />

roofing for deterioration and damage, describing its nature and extent in a written<br />

report, with copies to Architect and Owner.<br />

B. Correct deficiencies in or remove roofing system that does not comply with<br />

requirements, repair substrates, and repair or reinstall roofing system to a condition<br />

free of damage and deterioration at time of Substantial Completion and according to<br />

warranty requirements.<br />

C. Clean overspray and spillage from adjacent construction using cleaning agents and<br />

procedures recommended by manufacturer of affected construction.<br />

3.10 ROOFING INSTALLER’S WARRANTY<br />

A. See following attachment.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

BUILT-UP ASPHALT ROOFING 07511 - 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!