10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 3 - EXECUTION<br />

3.1 SPLICES AND TERMINATIONS:<br />

Neutral White<br />

Equipment Ground Green<br />

Isolated Ground Green w/yellow stripe #12 & #10<br />

Green and Yellow bands #8 and up<br />

A. Splices are to be made up complete promptly after wire installation. Single wire pigtails shall<br />

be provided for fixture and device connections. Wirenuts may be used for fixture wire<br />

connections to single wire circuit conductor pigtails.<br />

B. Splices shall utilize Scotch "Hyflex" or "Ideal" wing nut connector installed properly. Splices<br />

for No. 8 and larger wires shall be made with mechanically applied pressure type connectors.<br />

All taped joints shall be with "Scotch 33+" or equal, applied in half-lap layers without<br />

stretching to deform.<br />

C. Insulation shall be removed with a stripping tool designed specifically for that purpose. A<br />

pocket knife is not an acceptable tool. All conductors shall be left nick-free.<br />

D. Thermoplastic insulated wire and cable shall not be installed or handled in temperatures<br />

below +14 degrees F (-10 C). Cross-linked polyethylene insulated wire and cable may be<br />

installed to -40 degrees F (-40 C).<br />

3.2 INSTALLATION:<br />

A. Provide dedicated neutral for each branch circuit. Use of the shared neutral for multiwire<br />

branch circuit is not allowed.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

WIRES & CABLES Section 16120-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!