TARIKH TARIKH TEMPOH NILAI<br />

PERALATAN<br />

PATUT SEBENAR KELEWATAN<br />

TERIMA TERIMA (Hari)<br />

(RM)<br />

Holter Monitoring System 29.09.2010 28.12.2010 90 48,900<br />

Philips Cardiac Monitor 29.09.2010 08.12.2010 70 24,602<br />

Endoscope Processor 08.11.2010 22.12.2010 44 110,000<br />

Complete Endoscope Video System 15.11.2010 22.12.2010 37 289,998<br />

4 Channel Cardiorespiratory Monitoring 17.11.2010 30.12.2010 43 49,497<br />

Colonoscope 18.11.2010 22.12.2010 34 199,980<br />

Gastroscope 18.11.2010 22.12.2010 37 160,000<br />

Philips ECG PageWriter Touch 29.09.2010 30.12.2010 92 19,820<br />

JUMLAH 34 - 92 1,025,837<br />

Pada pendapat Audit, Kementerian hendaklah meningkatkan pemantauan terhadap<br />

pembekalan peralatan bagi memastikan pembekal membekalkan peralatan mengikut<br />

tempoh yang ditetapkan. Kementerian juga perlu menjalankan siasatan dan<br />

mengambil tindakan sewajarnya terhadap pegawai yang cuai sehingga menyebabkan<br />

kepentingan Kerajaan terjejas.<br />

39.5.3. Pengurusan Pembayaran<br />

39.5.3.1. Pengujian Dan Pentauliahan<br />

Dokumen sebut harga/pembelian terus bagi perolehan beberapa peralatan perubatan<br />

dan bukan perubatan menghendaki pengujian dan pentauliahan [Testing and<br />

Commissioning (T&C)] dijalankan sebelum pembayaran dibuat sepenuhnya. Pengujian<br />

dan pentauliahan ini bertujuan untuk memastikan peralatan yang diterima adalah<br />

lengkap dan boleh berfungsi dengan baik. Semakan Audit mendapati pembayaran<br />

sepenuhnya sebanyak RM0.70 juta telah dibuat bagi 21 peralatan antara 7 hingga<br />

131 hari lebih awal sebelum pengujian dan pentauliahan dijalankan. Butirannya adalah<br />

seperti di jadual berikut:<br />

JADUAL 39.8<br />

PEMBAYARAN DIBUAT SEBELUM PENGUJIAN DAN PENTAULIAHAN<br />

PERALATAN<br />

Hospital Duchess Of Kent<br />

TARIKH / NO.<br />

BAUCAR BAYARAN<br />

TARIKH<br />

T&C<br />

TEMPOH BAYARAN<br />

SEBELUM T&C<br />

(Hari)<br />

NILAI<br />

(RM)<br />

Lullaby Phototherapy System & Top<br />

Infusion/Syringe Pump<br />

26.11.2009 / D2973 12.01.2010 47 23,280<br />

Resuscitation Trolley 06.01.2010 / D3659 28.01.2010 22 18,400<br />

Portable X2 Monitor 05.01.2010 / D3671 13.01.2010 8 29,980<br />

Hospital Mechanical Single Bed 06.01.2010 / D3710 28.01.2010 22 36,500<br />

Vital Sign Monitor Lower Range 06.01.2010 / D3773 13.01.2010 7 47,920<br />

ESG System 06.01.2010 / D3774 10.03.2010 63 32,400<br />

Vital Sign Monitor Medium Range 06.01.2010 / D3750 13.01.2010 7 43,200<br />

Centrifuge 03.01.2011 / E4509 21.02.2011 49 29,296<br />

Vortex Mixer 03.01.2011 / E4509 21.02.2011 49 1,596<br />

Apnoea Monitor 05.01.2011 / E4650 15.03.2011 69 15,376<br />

Apnoea Monitor 04.01.2011 / E4677 15.03.2011 69 3,472<br />

Sample Concentrator 03.01.2011 / E4525 21.02.2011 50 5,296<br />

Gas Chromatography 04.01.2011 / E4648 26.01.2011 22 58,975<br />

Philips Cardiac Monitor 17.12.2010 / E3983 03.01.2011 17 24,800<br />

Air Compressor (Vacuum Pump) 03.01.2011 / E4510 21.02.2011 50 1,896<br />

Desktop PC & Printer 03.01.2011 / E4510 21.02.2011 50 2,990<br />

Infant Radiant Warmer - 3 unit 05.01.2011 / E4661 11.04.2011 96 53,700<br />

Infant Radiant Warmer 06.01.2011 / E4678 11.04.2011 97 17,900<br />