RAHSIA<br />

GAMBAR 53.33 GAMBAR 53.34<br />

Rumah Penghuni Di Flat Blok A<br />

- Leaking At The Bottom Side Of The Wash Basin Concrete Slab<br />

(27.07.2011)<br />

GAMBAR 53.35 GAMBAR 53.36<br />

Tingkat 1, Blok Pentadbiran<br />

- Eave Ceiling At The Valley Gutter Area Has Shown Sign<br />

Of Water Leaking<br />

(29.07.2011)<br />

All Round Turfing Area<br />

- The Soil Grass Turfing Areas Should Gradually Slope<br />

Down Instead Of 45 o Slope To Level<br />

(27.07.2011)<br />

GAMBAR 53.37 GAMBAR 53.38<br />

All Round Turfing Area - Padang Bola<br />

- Rumput Ditanam Di Atas Tanah<br />

Yang Bercampur Batu<br />

(28.07.2011)<br />

All Round Turfing Area,<br />

Padang Permainan Kanak-Kanak<br />

- Rumput Ditanam Di Atas<br />

Tanah Yang Bercampur Batu<br />

(27.07.2011)<br />

GAMBAR 53.39<br />

All Round Turfing Area - Kawasan<br />

Antara Jeti Dan Boat Ramp<br />

- Rumput Ditanam Di Atas Tanah<br />

Yang Bercampur Batu<br />

(27.07.2011)<br />

c. Antara sebab kualiti kerja pembinaan tidak memuaskan ialah ketidakpatuhan<br />

Kontraktor terhadap kaedah kawalan kualiti yang disediakan oleh perunding<br />

berhubung penyediaan Inspection Request Form. Inspection Request Form<br />

875 RAHSIA