RAHSIA<br />

KOS ASAL<br />

PROJEK<br />

(RM Juta)<br />

68.8<br />

JADUAL 53.4<br />

PENINGKATAN KOS PROJEK PEMBINAAN<br />

PANGKALAN POLIS MARIN, LAHAD DATU SABAH - FASA II<br />

PELARASAN HARGA KONTRAK (PHK)<br />

BUTIRAN<br />

PHK No. 1<br />

Penyelarasan item dalam Wang Peruntukan Sementara<br />

(Pontoon, Navigation/Beacon Light, Boat Hoist, Forklift & Jib<br />

Crane)<br />

PHK No. 2<br />

Omission to External Water Supply (Offsite)<br />

PHK No. 3<br />

Penyelarasan item dalam Wang Peruntukan Sementara<br />

(Jabatan Air Departmental Charges)<br />

PHK No. 4<br />

Tambahan kuantiti untuk kerja-kerja M&E di Grandstand,<br />

Jetty dan Fuel Pump House disebabkan oleh ketinggalan<br />

dalam BQ<br />

PHK No. 5<br />

Tambahan kuantiti untuk kerja-kerja M&E di Jetty,<br />

Multipurpose Hall dan Workshop disebabkan oleh<br />

ketinggalan dalam BQ<br />

PHK No. 6<br />

Kerja-kerja pengukuhan struktur pada Grandstand<br />

PHK No. 7<br />

Kerja-kerja pengukuhan struktur pada bangunan flat Kelas ‘F’<br />

PHK No. 8<br />

Kerja-kerja pengukuhan struktur pada Workshop<br />

PHK No. 9<br />

Kerja-kerja pengukuhan struktur pada Multipurpose Hall<br />

PHK No. 10<br />

Kerja-kerja tambahan M&E untuk memenuhi kehendak<br />

Bomba<br />

PHK No. 11<br />

Aviation warning light for elevated Water Tank<br />

PHK No. 12<br />

Incoming distribution Power Supply to the individual<br />

residential flat units<br />

PHK No. 13<br />

Omission for factory visit allowed in PHK No. 1<br />

PHK No. 14<br />

Revision of structural work at Ramp & Boatlift Platform<br />

PHK No. 15<br />

Remeasurement of Piling Works (Land)<br />

PHK No. 16<br />

Remeasurement of Piling Works (Marine)<br />

PHK No. 17<br />

Omission of SESB Contribution<br />

PHK No. 18<br />

Penyelarasan item Wang Peruntukan Sementara (Fuel/Oil<br />

Interceptor)<br />

PHK No. 19<br />

Penyelarasan item Wang Peruntukan Sementara (Signages)<br />

PHK No. 20<br />

Penyelarasan item Wang Peruntukan Sementara<br />

(Communication Requirements)<br />

PHK No. 21<br />

Penyelarasan turun naik harga bahan binaan<br />

KOS<br />

TAMBAH/(KURANG)<br />

(RM)<br />

(167,826)<br />

(261,748)<br />

262,900<br />

24,274<br />

3,879<br />

21,595<br />

614,950<br />

29,782<br />

21,511<br />

57,290<br />

14,980<br />

301,623<br />

(84,000)<br />

(10,058)<br />

(69,672)<br />

(71,640)<br />

(500,000)<br />

(25,990)<br />

(38,388)<br />

(451,898)<br />

4,832,906<br />

KOS BARU<br />

PROJEK<br />

(RM Juta)<br />

73.30<br />

JUMLAH 4,504,470 73.30<br />

866 RAHSIA