23.06.2013 Views

Library Buildings around the World

Library Buildings around the World

Library Buildings around the World

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Die neue Biblio<strong>the</strong>k wird von zwei Seiten zugänglich sein: vom Ortszentrum über die Goldgasse und vom Parkplatz Trutsch.<br />

(http://biblio<strong>the</strong>k-Kaltern.blogspot.de) 18.12.2012<br />

Archea Associati, Firenze – Italy<br />

http://www.archea.it<br />

Libraries:<br />

Municipio e centro culturale, Figline Valdarno (FI) – Italy in costruzione<br />

Committente Comune di Figline Valdarno, Prezzo € 4.000.000, Superficie Costruita 3.010 mq<br />

Collocato nel settore sud della città murata, l’intervento interessa la trasformazione di un ex-edificio scolastico costruito nei primi<br />

anni del Novecento. Il progetto riguarda la realizzazione di un centro polifunzionale: biblioteca, archivio, museo dell’Antica<br />

Spezieria Serristori, gli uffici comunali e la sede del Municipio. Il nuovo corpo di fabbrica mantiene l’originaria configurazione a<br />

“C” accentuata dal prolungamento delle due stecche preesistenti ma conquista un diverso ruolo urbano attraverso l’inserimento di<br />

un’ampia copertura a sbalzo – sugli ingressi dalla strada e dal parco retrostante – e una torre che definisce un nuovo landmark per<br />

la città. L’articolazione funzionale evidenzia la suddivisione in due parti che distinguono gli spazi lavorativi per gli uffici<br />

dell’Amministrazione – al primo piano e nella torre – da quelli pubblici, concepiti – questi ultimi – come estensione del piano terra<br />

alle piazze coperte sottostanti i nuovi sbalzi, utilizzabili per manifestazioni temporanee o espositive. L’intero complesso è reso<br />

omogeneo da un rivestimento in pietra naturale che declina in chiave contemporanea i caratteri costruttivi e materici del contesto.<br />

(Archea)<br />

Biblioteca Communale di Nembro (BG) – Italy 2007<br />

Location Nembro – Bergamo, Project Biblioteca e centro culturale, Client Comune di Nembro, Structures Favero&Milan<br />

Ingegneria, Temparature Control Systems Studio Tecnico Zambonin, Electrical Systems Eros Grava, Plan 2002, Realization 2005-<br />

2007, Cost € 1.888.250,00; Buuilt Area 1.875 sqm, Volume 11.200 cum<br />

Contractor Zeral srl Costruzioni edili.<br />

A building erected in 1897, intended as a primary school, that has been used for many purposes over <strong>the</strong> years, first becoming town<br />

hall, <strong>the</strong>n kindergarten and finally consulting room. The request of <strong>the</strong> municipality was to solve <strong>the</strong> contingent state of abandon,<br />

turning <strong>the</strong> building into a library, to provide <strong>the</strong> town with a facility dedicated to education and information of <strong>the</strong> residents.<br />

The strategic position in relation to <strong>the</strong> urban tissue, <strong>the</strong> architectural character of <strong>the</strong> original structure, closed on three sides, and<br />

<strong>the</strong> need for new spaces oriented <strong>the</strong> project towards <strong>the</strong> addition of a new wing in <strong>the</strong> form of a new construction that closes <strong>the</strong> only<br />

open side, that once faced a courtyard. The new building, connected via <strong>the</strong> basement, is separated from <strong>the</strong> existing structure on all<br />

sides, thus underscoring a difference that, in spite of <strong>the</strong> communicating plan, bears witness to a constructive and formal choice that<br />

establishes a dialectic contrast with <strong>the</strong> historical character of <strong>the</strong> original building; completely transparent, it is characterized by its<br />

surface, made of terracotta elements measuring 40x40 centimeters, glazed in carmine red, supported by a structure made from<br />

coupled steel profiles. This building technique has made it possible to screen and filter <strong>the</strong> sunlight. The choice of ear<strong>the</strong>nware has<br />

been suggested precisely by <strong>the</strong> typical characteristics of <strong>the</strong> material, its performance as a screen protecting from light and its link<br />

to traditional building methods, but also by <strong>the</strong> contemporary image created thanks to <strong>the</strong> assembly technique and its durability.<br />

A large room with computers available for consulting is located in <strong>the</strong> basement, which also provides access to <strong>the</strong> new building and<br />

its reading room that contains, in <strong>the</strong> manner of a casket, <strong>the</strong> precious books available for consulting; <strong>the</strong> triple height is exploited by<br />

two projecting mezzanines housing numerous reading desks, while <strong>the</strong> main study rooms are located on <strong>the</strong> ground and first floor of<br />

<strong>the</strong> old building. (Archea)<br />

Biblioteca e Auditorium di Curno (BG) – Italy 2009<br />

Location Curno – Bergamo, Project Biblioteca e auditorium, Client Comune di Curno, Structures Studio Myallonnier, Systems<br />

Studio Armondi, Plan 1996, Realisation 1999-2009, Cost € 2.000.000,00, Built Area 1.960 m², Volume 8.200 m², Contractor Viola<br />

Costruzioni.<br />

The site for <strong>the</strong> building of a new public library and a small auditorium with 250 seats has been found inside an existing school<br />

campus. The location has suggested <strong>the</strong> idea of a project centred on <strong>the</strong> continuity of <strong>the</strong> surrounding public area. The building,<br />

conceived as a kind of open book, is <strong>the</strong>refore characterized by a sloping roof which is terraced to form stands, and which may be<br />

used for open-air events, to extend <strong>the</strong> public square in front to <strong>the</strong> roof of <strong>the</strong> building. The plan distinguishes <strong>the</strong> activities which<br />

pivot on <strong>the</strong> rectangular hall of <strong>the</strong> auditorium from <strong>the</strong> areas of <strong>the</strong> library, whose perimeter consists of a longitudinal outline<br />

characterized by <strong>the</strong> jagged geometry of <strong>the</strong> external facade. The line of demarcation and communication between <strong>the</strong> two areas<br />

takes <strong>the</strong> form of a new urban itinerary, a triple-height void paced horizontally by a system of split levels which in <strong>the</strong>ir turn serve as<br />

communication paths, and vertically by a succession of uprights which structure <strong>the</strong> entire wall as container case of books. The<br />

materials, which have been reduced to <strong>the</strong> essentiality of an untreated concrete mixed with colour, have made it possible to mould<br />

<strong>the</strong> vertical surfaces as <strong>the</strong> pages of a conceptual book, engraved here and <strong>the</strong>re with letters. (Archea)<br />

Area Progetti, Torino – Italy<br />

http://www.area-progetti.it<br />

Libraries:<br />

Biblioteca Civica a Chicasso nel Movicentro – Italy 2007-2011 in corso<br />

localizzazione: scalo merci ferroviario di Chivasso, committente: Comune di Chivasso, importo opere: € 2.534.443, superficie utile:<br />

1.800 m²<br />

Biblioteca Civica a Cologno Monzese –Italy 2010<br />

Biblioteca Communale a Fiorano Modense – Italy 2006-2011<br />

Committente: Comune di Fiorano Modenense, importo opere: € 3.025.130, superfice utile: 1.408 m², collaborazioni: Studio Buonomo<br />

Veglia<br />

Il 1° ottobre 2011 è stato inaugurato il un nuovo centro culturale polifunzionale di Fiorano Modenese, che unisce in un’unica sede la<br />

biblioteca, la ludoteca e l’archivio comunale.<br />

Realizzato con una spesa di poco più di 3 milioni di euro finanziati interamente da Fiorano Gestioni Patrimoniali, società con<br />

partecipazione unica pubblica, il Bla mette a disposizione della città 1.700 nuovi metri quadri all’interno di una struttura costituita<br />

dall’intersezione di due corpi parallelepipedi a uno e due piani fuori terra.<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!