23.06.2013 Views

Library Buildings around the World

Library Buildings around the World

Library Buildings around the World

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DAM Architects, Montréal, QC – Canada<br />

http://www.desnoyersmercure.com<br />

Libraries:<br />

Bibliothèque Kirkland, Kirkland, QC – Canada 2011<br />

Client : Ville de Kirkland, Coût : 2 545 000 $, Fin des travaux : 2011<br />

À l’aube de ses vingt ans d’existence, la bibliothèque municipale de Kirkland demande à être rénovée et son environnement, rajeuni.<br />

Le programme des travaux comprend l’intégration d’un nouvel ascenseur à l’entrée existante pour permettre l’accès universel aux<br />

espaces situés en sous-sol ainsi qu’une rénovation complète des systèmes mécaniques et de l’éclairage des salles de lecture.<br />

DMA propose une approche en continuité avec le bâtiment existant, où l’entrée est toutefois complètement remodelée pour marquer<br />

le renouveau et ouvrir la bibliothèque sur la communauté. Ceci est conçu de manière à laisser entrer la lumière naturelle par le<br />

Nord, tout en ne gênant pas les activités de lecture à l’intérieur de la bibliothèque. (DAM)<br />

Bibliothèque Fraser Hickson, Montréal, QC – Canada Concept 2009<br />

Client : Église Trinity Memorial<br />

En 2009, L'institut Fraser Hickson vend ses installations de Notre-Dame de Grâce et projette de se relocaliser sur un site plus petit<br />

afin de réduire ses coûts d'opération à long terme. Le projet élaboré par DMA propose de relocaliser la bibliothèque au sous-sol de<br />

l'Église Trinity Church, permettant ainsi également à l'Église de rationaliser et moderniser ses installations (ajout d'un ascenseur et<br />

transformation du système de chauffage) et réduire ses propres coûts d'exploitation.<br />

Le projet est conçu en deux phases : la première visant l'installation, à court terme, de la salle de lecture principale au sous-sol de<br />

l'église; la deuxième phase profite du potentiel de développement permis par le zonage du site et vise un agrandissement de la<br />

bibliothèque sur le terrain adjacent à l'Église, avec une nouvelle adresse autonome et des infrastructures d'accueil indépendantes de<br />

celle-ci. Ce projet, qui demeure aujourd'hui un bel exemple d'optimisation dans le développement immobilier d'un patrimoine<br />

religieux, est encore à l'étude et à l'étape de recherche de financement. (DAM)<br />

Bibliothèque du Parlement d'Ottawa, Ottawa, ON – Canada 2008<br />

joint venture with: Ogilvie and Hogg et Spencer R. Higgins and Lundholm Associates<br />

Client : Travaux Publics Canada, Coût : 78 000 000 $, Fin des travaux : 2008<br />

Designed by Thomas Fuller (1823 Bath Enland – 1898 Ottawa Canda) and Chilion Jones (1838 – 1912), and inspired by <strong>the</strong> British<br />

Museum Reading Room, <strong>the</strong> building is formed as a chapter house, separated from <strong>the</strong> main body of <strong>the</strong> Centre Block by a corridor;<br />

this arrangement, as well as many o<strong>the</strong>r details of <strong>the</strong> design, was reached with <strong>the</strong> input of <strong>the</strong> <strong>the</strong>n parliamentary librarian,<br />

Alpheus Todd. The walls, supported by a ring of 16 flying buttresses, are load bearing, double-wy<strong>the</strong> masonry, consisting of a<br />

hydraulic lime rubble fill core between an interior layer of finished stone and rustic Nepean sandstone on <strong>the</strong> exterior. Around <strong>the</strong><br />

windows and along o<strong>the</strong>r edges is dressed stone trim, along with a multitude of stone carvings, including floral patterns and friezes,<br />

keeping with <strong>the</strong> Victorian High Gothic style of <strong>the</strong> rest of <strong>the</strong> parliamentary complex. The roof, set in three tiers topped by a cupola,<br />

was originally a timber frame structure covered with slate tiles, but is presently built of steel framing and deck covered with copper.<br />

The initial overall combination of colours—grey Gloucester limestone and grey Nepean, red Potsdam, and buff Ohio sandstones, as<br />

well as purple and green slate banding—conformed to <strong>the</strong> picturesque style known as structural polychromy.<br />

The main reading room of <strong>the</strong> <strong>Library</strong> of Parliament<br />

The main reading room rises to a vaulted ceiling and <strong>the</strong> walls and stacks are lined with white pine panelling carved into a variety of<br />

textures, flowers, masks, and mythical creatures. In <strong>the</strong> galleries are displayed <strong>the</strong> coats of arms of <strong>the</strong> seven provinces that existed in<br />

1876, as well as that of <strong>the</strong> Dominion of Canada, and standing directly in <strong>the</strong> centre of <strong>the</strong> room is a white marble statue of Queen<br />

Victoria, sculpted by Marchall Wood in 1871. The nor<strong>the</strong>rn galleries are also flanked with <strong>the</strong> white marble busts of Sir John<br />

Sandfield Macdonald; Prince Edward, Prince of Wales (later King Edward VII); Alexandra, Princess of Wales (later Queen<br />

Alexandra); and Sir Étienne-Paschal Taché.<br />

La Bibliothèque du Parlement, classée monument historique national, a ouvert ses portes à l’origine en 1876; elle a été modifiée en<br />

1953 à la suite d’un incendie majeur. Ses qualités architecturales exceptionnelles et son profil sur la colline parlementaire en font la<br />

meilleure référence au Canada du style « néogothique de la grande époque victorienne ».<br />

Le mandat octroyé à DMA (en consortium) consistait en la conservation et la réhabilitation de cet édifice remarquable. L’étendue<br />

des travaux comprenait le remplacement des toitures, la restauration des fenêtres, la consolidation des murs porteurs en maçonnerie,<br />

la rénovation des espaces intérieurs, le remplacement des systèmes mécaniques/électriques désuets et la conservation des finis<br />

intérieurs. Pour l’intégration de nouveaux espaces pour les livres et les systèmes mécaniques, 13 mètres de profondeur fut excavé<br />

dans le roc sous le bâtiment et ces services furent distribués verticalement de manière à les intégrer et à les dissimuler.<br />

La préservation de l’esprit patrimonial existant à la Bibliothèque du parlement a inspiré la stratégie de conservation dans la<br />

conception des nouvelles interventions mais sans imitation servile. (DAM)<br />

Cour Suprême du Canada, <strong>Library</strong>, Ottawa, ON – Canada 1995<br />

Client : Travaux Publics Canada, Coût : 18 000 000 $, Fin des travaux : 1995<br />

Bâtiment construit en 1951, il fut décidé vers la fin des années 80 de procéder à une mise aux normes du point de vue sécuritéincendie,<br />

de remplacer la toiture, de rendre le bâtiment accessible aux personnes à mobilité réduite et surtout de réorganiser la<br />

bibliothèque pour recevoir plus de 500,000 volumes et pour assurer la préservation de la plus importante collection de droit civil et<br />

de droit commun au Canada.<br />

La bibliothèque à l’époque de la construction du bâtiment avait été aménagée dans la partie sud du troisième étage. Les problèmes<br />

d’accessibilité et d’espace ont depuis rendu ces espaces inadéquats pour une bibliothèque de cette importance. L’objectif principal<br />

consistait à trouver l’espace nécessaire pour loger le programme proposé par les responsables de sa réorganisation, de lui conférer<br />

un caractère en harmonie avec la noblesse des lieux et de l’intégrer au fonctionnement de l’ensemble du complexe judiciaire avec une<br />

relation directe avec le grand Hall d’Honneur au rez-de-chaussée. (DMA)<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!