23.06.2013 Views

Library Buildings around the World

Library Buildings around the World

Library Buildings around the World

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

uilding looks solid, according to <strong>the</strong> serious look of a scientific institute. Brick facades with small windows emphasize <strong>the</strong> large scale<br />

of <strong>the</strong> building. In two corners <strong>the</strong>re are big holes in <strong>the</strong> walls, however made. Extremely large glass panes underline as <strong>the</strong> diagonal<br />

opening of <strong>the</strong> building. Clearly, in <strong>the</strong> Forum building in an orderly way, many features have been incorporated. The life of<br />

students and teachers is undoubtedly become more comfortable through, but <strong>the</strong> question is whe<strong>the</strong>r <strong>the</strong> building is a symbol of <strong>the</strong><br />

university will grow. The solid, somewhat dull character appearing in any case that it directly as a new logo on <strong>the</strong> retina is burned.<br />

(http://www.architectenweb.nl)<br />

Rapp+Rapp, Rotterdam – The Ne<strong>the</strong>rlands<br />

http://www. rappenrapp.nl<br />

Libraries:<br />

penbare biblio<strong>the</strong>ek Utrecht, Utrecht – The Ne<strong>the</strong>rlands 2012<br />

18,000 m² library<br />

3,000 square art house, 120 apartments, 260 parking spaces Client: Municipality of Utrecht plan development Start: 2008<br />

Completion: 2012 building costs: € 50 million<br />

There are quite a few steps put into developing <strong>the</strong> new <strong>Library</strong> + + 'next to Utrecht Central. The Board agrees with <strong>the</strong> final award<br />

to architects Rapp + Rapp, <strong>the</strong> plan for <strong>the</strong> redevelopment of <strong>the</strong> Smakkelaarsveld and financial impact. The design process can now<br />

go. The new library is a building that literally and figuratively to <strong>the</strong> imagination. <strong>Library</strong> Artplex and apartments under one roof<br />

, <strong>the</strong> new building is not a traditional "store house of books." The addition of such organizations Artplex (film & entertainment) and<br />

Art <strong>Library</strong> is <strong>the</strong> place for information in Utrecht, floor, relaxation and meeting. Of course you are still books, CDs and art lend.<br />

But you can also play games, attend a lecture or debate, watch a movie, a cup of coffee or a bite to eat. The building also provides<br />

space for approximately 120 apartments, parking and bicycle parking. You may receive <strong>the</strong> Utrecht Centre for <strong>the</strong> Arts also has a<br />

place in <strong>the</strong> building. There, after a decision taken. The construction costs for <strong>the</strong> construction of <strong>the</strong> new <strong>Library</strong> + + (including<br />

housing and parking) amount to more than 90 million euros. The council is asked voorbereidingskrediet of 2.2 million euros<br />

available for <strong>the</strong> fur<strong>the</strong>r development of vision to Preliminary Design. This is expected to be completed late 2010. According to<br />

current planning <strong>the</strong> new library opened in 2015. (http://www.biblio<strong>the</strong>ek-utrecht.nl)<br />

Rappange & Partners Architects, Amsterdam – The Ne<strong>the</strong>rlands<br />

http://www.rappange.nl<br />

Libraries:<br />

<strong>Library</strong> Diemen – Wilhemina Plantsoen, Diemen (Prov. North-Holland) – The Ne<strong>the</strong>rlands 2008<br />

Commissioned by <strong>the</strong> former Rabo Vastgoed Rabo office on Wilhelmina Plantsoen Diemen converted into 43 apartments, 600 m2<br />

public library, 400 m2 Rabobank branch and 46 covered parking spaces. For <strong>the</strong> library, <strong>the</strong> entire interior design including<br />

furniture, furnishings and lighting. (Rappange)<br />

On behalf of <strong>the</strong> former Rabo Vastgoed Rabo office on Wilhelmina Plantsoen grown in Diemen. The conversion of this office, <strong>the</strong><br />

walls completely demolished. The remaining hull: floors, columns, stairwells and elevator shafts were <strong>the</strong> starting point for <strong>the</strong> new<br />

design. This resulted in 43 spacious apartments with generous terraces and logia's. On <strong>the</strong> ground floor is a bank branch, a branch<br />

of <strong>the</strong> public library and 43 indoor parking spaces. (http://www.architectenweb.nl)<br />

RAU, Amsterdam – The Ne<strong>the</strong>rlands<br />

http://www.rau.eu<br />

Libraries:<br />

ROC Leiden, Leiden – The Ne<strong>the</strong>rlands 2003 - 2011<br />

Gross floor area: 54,300 m2<br />

Function: Regional Training Centre in VMBO, offices, industrial, retail and parking garage<br />

Performance: including flexible structure and layout of siding recycle. concrete and low net / gross floor ratio by integrating systems<br />

in <strong>the</strong> construction<br />

The ROC Leiden, with over 10,000 students and 800 staff are awaiting resettlement. Drive <strong>around</strong> Lammenschans arises from such a<br />

new vision of vocational training and work a busy city: easily accessible, on a human scale and literally transparent. Lammenschans:<br />

<strong>the</strong> triangle between <strong>the</strong> Leiden-Utrecht railway (stop RijnGouweLijn), <strong>the</strong> Rhine-Schie canal and Lammenschansweg (close to A4).<br />

A gateway to <strong>the</strong> eastern flank of Leiden potential. The ROC - vocational training for thousands of students, hundreds of directions<br />

and dozens of buildings. "Innovative learning:" learning in an open, entrepreneurial and socially responsible institution where <strong>the</strong><br />

individual career comes first ". This innovation takes <strong>the</strong> same time as <strong>the</strong> building form. The new ROC stacks and traffic<br />

capabilities to a light, ascending, meandering building on an o<strong>the</strong>rwise vacant parking lot of <strong>the</strong> ROC. Thus, in <strong>the</strong> same gesture and<br />

shadow noise nuisance to adjacent residential area, <strong>the</strong> moving pressure and land costs kept to a minimum. A surprising urban<br />

design <strong>the</strong>ory in which all forms of education visible. Suppose you were <strong>the</strong> small buildings of a large educational campus that is now<br />

widely distribute over <strong>the</strong> space stacking up to 5 towers sloping at 3 different large tables. You would win for outdoor plazas. Then<br />

you could loose buildings grouped on and <strong>around</strong> <strong>the</strong> table tops. That were beyond <strong>the</strong> courtyards. It was not a building but a small<br />

vertical town from different buildings. Because markets and associated ramps. Not only before <strong>the</strong> building but also in <strong>the</strong> building<br />

heights are staggered squares, with green and shops. The most central market in <strong>the</strong> center of <strong>the</strong> building is accessible via<br />

escalators. Here are <strong>the</strong> library and information center. The different activities are grouped <strong>around</strong> <strong>the</strong>se markets, places of<br />

encounter and cross-fertilization. All <strong>the</strong> 'accommodation' toge<strong>the</strong>r form <strong>the</strong> "ROC City. ROC is part of many traffic. Thousands of<br />

train passengers passing through every day Lammenschans station (purple). Disembarked, <strong>the</strong>y decorated with green cover by<br />

means of ROC (green) to <strong>the</strong> present paved "active" square socket on <strong>the</strong> local bus (yellow), or <strong>the</strong> green zitplein <strong>the</strong> fast tram (red).<br />

1,500 bicycles and 750 cars disappear under ROC (blue). Our own expedition runs from behind (pink). For a great layout flexibility,<br />

both <strong>the</strong> ceiling clouds and <strong>the</strong> connecting point for air conditioning, electrical and data cabling all tuned to a grid of 1.8 m. This<br />

allows even <strong>the</strong> smallest pattern in this room of 1.8 meters at any place in <strong>the</strong> building realized. (RAU)<br />

Multifunktionszentrum Antares (Tabakssteeg) Leusden Zuid, Leusden – The Ne<strong>the</strong>rlands 2005 - 2010<br />

Gross floor area: 8.400 m2<br />

Function: 2 primary schools, nursery, playgroup, after school, public library, community center, gym and free rentable space<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!