Wolfgang Cronenbroeck<br />

– Contents <strong>of</strong> the work packet / project section:<br />

– Work packet responsibility<br />

– Expected outcomes<br />

– Dependencies <strong>and</strong> interfaces to other components<br />

– Scheduling<br />

– Budgeting<br />

Effort estimate<br />

Every work packet at the lowest level (Fig. 16, level 2) <strong>of</strong> the project breakdown can be divided<br />

into further processes for a better estimate <strong>of</strong> the effort. These procedures should be constructed<br />

in such a way that they do not exceed 10 person-days per step, <strong>and</strong> which can be, as much as<br />

possible, worked on by one employee. Several technical processes that belong together form a<br />

work packet.<br />

Effort in person-days is estimated for every process. The efforts for the parent structures arise<br />

from the classification in accordance with the project breakdown <strong>and</strong> summation. The estimated<br />

effort should provide a basis to capture the cost <strong>of</strong> a project. An estimate on the basis <strong>of</strong> "manage-<br />

able" units (e.g. processes) is generally more accurate than an estimate for the overall project.<br />

It is difficult in practice for many project staff to estimate the effort <strong>of</strong> a process. The project man-<br />

ager must encourage the project employees to give even inexact estimates <strong>and</strong> to correct them<br />

with his additional know-how.<br />

Estimates <strong>of</strong> effort are generally made using the following methods:<br />

– Analogy methods<br />

With known <strong>and</strong> assured key figures, the effort for similar tasks is estimated by using<br />

analogies (for a module test, a qualified employee needs 2 person-days; for three similar<br />

module tests, then 6 person-days are needed).<br />

– Expert estimation:<br />

By querying experts, one can try to obtain reliable effort estimates.<br />

– Own estimates:<br />

The project manager divides the work content to a degree at which he can trust his own<br />

estimate (see Fig. 19), <strong>and</strong> then aggregates the section efforts contained to form a total effort.<br />

214