215 Project Management<br />

2.2.3 COURSE AND DEADLINE PLANNING<br />

Figure 19 | Classification <strong>of</strong> work packets into individual processes<br />

Effort estimates <strong>of</strong> all work packets form the basis for further planning. The calculated duration<br />

for course <strong>and</strong> scheduling is made possible by arranging work processes <strong>and</strong> work packages.<br />

The scheduling <strong>and</strong> course planning runs in four steps, <strong>and</strong> is explained in the example <strong>of</strong> a work<br />

packet with 3 processes (Fig. 20)<br />

Effort <strong>and</strong> duration<br />

No. Process estimated effort (PT)<br />

1 Work packet 27<br />

1.1 Create a specifications document 5<br />

1.2 Produce a surface prototype 6<br />

1.3 Create a model 16<br />

Figure 20 | Work packet with three individual procedures<br />

The duration <strong>of</strong> a procedure is calculated according to the following formula:<br />

Effort (PT)<br />

Duration (T) = ----------------------------------------------------------------------<br />

Number <strong>of</strong> employees (P) * availability (%/100)