MAINTAINING ASSET CARD REGISTER OF PLANT & MACHINERY :<br />

156<br />

Asset Card Register in respect of Transformer, Switchgear, Capacitor and Other<br />

machineries is maintained in Commercial Section. Material requisition issued for<br />

above said plant and machinery equipments by concern department particularly<br />

Erection, Street Lighting are processed in monthly cost statement. These cost<br />

statement are received from EDP department. As per the cost statement, cost of<br />

the equipment is written on the material requisitions and same is also recorded in<br />

the Asset Card register. Asset Card register is maintained Sub-Station wise and<br />

Receiving Station wise in which equipment also categories i.e Transformer,<br />

Switchgear, Capacitor & Other machineries. At the close of the month Asset card<br />

register is reconciled with monthly complete supply cost statement as well as<br />

incomplete cost statement which are booked in the Books of Accounts.<br />

Cost of labour is also recorded in the Asset Card register as per the activities and<br />

Locations.<br />

All requisitions and credit notes in respect of completed job & incompleted jobs<br />

are sorted out as per location code and activity wise. These requisitions are<br />

preserved in file.<br />

SUPERVISORY JOB : The work of Building Inventory, Meters Inventory,<br />

Despatching of requisitions to DEP and checking of monthly Supply Cost Statement.<br />

CLERK (1)<br />

Maintaining of Job Sheets Work<br />

Accounts Department received job sheets from various departments<br />

particularly from Supply Branch, Building department and Transportation<br />

Engineering . All these job sheets daily checked and forwarded to EDP Dept.<br />

EDP Dept. process the job sheets and forward the labour cost as well as<br />

Labour finance statement to Account Dept. This cost statement is received<br />

separately for revenue and capital work .<br />

Job sheets clerk on receipt of the labour finance statement from EDP<br />

prepares Journal entry for Revenue and Capital expenditure. Same is booked<br />

every month in the Books of Account by debiting to various labour R & M<br />

activity as well as capital block A/C and crediting to salary clearing A/C No. 801.<br />

Checking of Job sheets<br />

Before forwarding of job sheets to EDP dept., activity code, location code, SD<br />

code, BD code, written on the job sheet are checked whether the descriptions of<br />

job, activity and locations are co-related with description. If any discrepancies