15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1734<br />

39) To bring immediately to the notice of superiors any difficulties<br />

/ problems/ unusual incidents during the working period and<br />

to keep them posted about day today working.<br />

40) To attend other specific works as assigned by superior officers<br />

from time to time.<br />

Sr.No.20<br />

CHIEF ESTIMATOR (Gr.P4/GV)<br />

He shall be responsible to the Deputy Engineer /Assistant<br />

Engineer and other superior Officers as the case may be and he is<br />

required to work under the Assistant Engineer with direct<br />

instructions from Deputy Engineer. His duties and responsibilities<br />

are as follows.<br />

15) To have overall control and supervision over the Estimating<br />

Section.<br />

16) To prepare estimates / draft tenders as and when required.<br />

17) To scrutinise estimates, draft tenders and quotations prepared<br />

by the estimators, overseers and sub-overseers and forward<br />

the same for approval.<br />

18) To allot work to estimators and other staff.<br />

19) To make arrangements for stenciling of approved draft tenders<br />

/ quotations.<br />

Page 1734

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!