15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

445<br />

x) Lost property register<br />

xi) Inward-Outward despatch system<br />

xii) APF and Checking sheet entry and related reports<br />

xiii) Inspector performance report<br />

a.2 Activities of Depot Office :-<br />

i) Duty allotment for Conductors and Drivers,<br />

Inspectors and Starters.<br />

ii) Posting book and related report regarding<br />

Conductors and Drivers, Inspectors and Starters.<br />

iii) Chowkey Detention.<br />

a.3 Using the leave record generated in the Traffic System of<br />

the depot, the work of Time Keeping Department is also<br />

computerised and this job has eliminated the work of<br />

preparing workout cards of the Traffic Outdoor Staff<br />

which is required for the Payroll jobs. The data is now<br />

given to the E.D.P. Department on floppy for the Traffic<br />

outdoor staff. This system is fully implemented at all the<br />

depots in Time Keeping Offices.<br />

a.4 Regular processing of Daily Vehicular Return (DVR)<br />

System.<br />

b. The following applications of the Traffic Planning are<br />

computerised :<br />

i) Traffic Revenue<br />

ii) Monthly Bulletin of Traffic Department.<br />

c. Following modules are developed for Traffic Control :-<br />

i) Attendance of “A” and “B” Grade Officers i.e. On Line<br />

entry of R-on, R-off and R-calls and corresponding<br />

reports viz. Daily attendance sheet, monthly attendance<br />

of individual officer.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!