15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1625<br />

install transforming equipments, switch gear and to lay<br />

cables in the private property for the purpose of giving<br />

electric supply to general public, application to the<br />

Commissioner of Police is made in case of obstruction by<br />

the land ower/occupant.<br />

Procedure :<br />

Whenever there is need of installing transformers,<br />

laying of cables for giving electric supply to people and<br />

there is no agreement for taking over the site with the<br />

landlord, application has to be made to the<br />

Commissioner of Police for the permission to install the<br />

transformers, switch gear etc. The Planning Section of<br />

the Supply Division provides all information including<br />

site plans. A draft of the application to be submitted to<br />

the Commissioner is put up by Dy.LA/ALA to AGM(L) for<br />

approval. Thereafter it is submitted to the<br />

Commissioner of Police. Notices of the application are<br />

sent to the owner/occupant of the property as well as to<br />

the <strong>Undertaking</strong> by the office of the Commissioner of<br />

Police. AGM(L) represents the case of the <strong>Undertaking</strong><br />

before the Commissioner and the concerned officer of<br />

the Supply Division remains present for giving assistance<br />

about technical information.<br />

c) ELECTRICAL INSPECTOR AND THE STATE<br />

GOVERNEMT<br />

Disputes regarding electric tariff, accuracy of meters<br />

supplementary bills and all such matters arising out of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!