15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1755<br />

Sr.No.26<br />

OVERSEER – (Grade P1/T7)<br />

He shall be responsible to the Chief Estimator / Deputy<br />

Engineer and other Superiors officers as the case may be his duties<br />

and responsibilities are as follows :<br />

12) To prepare block estimates.<br />

13) To prepare detailed estimates for building structures, general<br />

development including water supply and drainage etc. on the<br />

basis of drawings prepared.<br />

14) To work out quantities of cement and steel required for<br />

building structures.<br />

15) To work out rates for special type of works not included in<br />

schedule.<br />

16) To carry out market inquiries about rates of building materials<br />

and labour for preparation of rate analysis for the Schedule of<br />

Rates.<br />

17) To prepare draft tender documents indicating schedule of<br />

quantities and specifications and conditions of contract.<br />

18) To compare stencils with manuscripts, to get corrections made<br />

and finally to compile copies of tender document.<br />

19) To maintain files of estimates, catalogues and index register<br />

in respect of estimates for reference.<br />

Page 1755

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!