While checking completed receipt book with the Issue Register, the Audit Clerk<br />

ensures that the completed receipt Book does not contain any unused receipt. He, then,<br />

checks the date of completion against the book number as noted in the Register.<br />

Once a month, the Issue Register is scrutinized to check whether any receipt book has<br />

remained incomplete for over 3 months. If so, the matter is taken up with the<br />

department to have the book transferred and get it completed. This is done to avoid the<br />

possibility of losing track of such unused / partly used books which may fall into<br />

wrong hands or otherwise be misused.<br />

8.7.6 Checking of Posting of Receipts in the Ledgers:<br />

To ensure that amounts receipted are correctly credited to proper accounts, receipt<br />

stubs are compared with their postings in the Ledgers against appropriate accounts. As<br />

the work involved is voluminous and as the Consumers Department itself exercises<br />

departmental control by reconciling total payments posted in the Ledgers with the<br />

monthly figures of the Receipt Section, a test check is carried out.<br />

8.7.7 Temporary Illumination Accounts:<br />

Temporary connections are given by the Distribution and Commercial Department for<br />

–<br />

1) Purely temporarily illumination in the case of marriages, social<br />

gatherings, exhibitions, tile polishing, etc.<br />

846<br />

2) Industrial premises during the initial period when ‘No Objection’<br />

Certificate from Competent Authority is awaited. The temporary<br />

supply is connected after initial payment of (1) Meter connection<br />

fee – as per conditions of supply (2) Security Deposit on the basis<br />

of connected load mentioned in the conditions of supply.<br />

Tariff is charged as per the existing schedule of charges approved by<br />

the Committee, Corporation and MERC. Meter Rent is charged as<br />

mentioned in the conditions of Supply and Duty is levied as mentioned<br />

in Part ‘E’ of the Schedule of Bombay Electricity Duty Act 1958.<br />

To check Temporary Illumination Accounts, the following particulars<br />

are checked in the Temporary Illumination Ledgers from the<br />

connection order.<br />

(a) Name of the Consumer.