15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

406<br />

CHAPTER -1<br />

INTRODUCTION<br />

1.1. The Electronic Data Processing Department, referred as E.D.P. Department<br />

hereafter, of the B.E.S. & T. <strong>Undertaking</strong> is one of the service departments<br />

under the General <strong>Administration</strong> Branch dealing with computerisation<br />

activities of various departments of the <strong>Undertaking</strong>. This department was<br />

established in the year 1968 when the computerisation was introduced in the<br />

B.E.S.& T. <strong>Undertaking</strong>. The Central EDP Department is located on the 2 nd<br />

Floor, Traffic Administrative Building at Backbay Bus Depot, Cuffe Parade,<br />

Mumbai – 400 005. One more office for EDP Department has started<br />

functioning at the New Ancillary Building, 2 nd Floor at Wadala Depot w.e.f.<br />

18.10.2004.<br />

1.2. The E.D.P. Department started as central data processing department.<br />

However, with the change in technology and requirements, it is slowly being<br />

decentralised by focussing on the computerisation of the individual user<br />

departments. This has helped the <strong>Undertaking</strong> to save the manpower, expedite<br />

the processing by reducing the time log, thereby increasing the overall<br />

efficiency of the departments.<br />

1.3. Earlier when the Ticket Accounting System and Daily Vehicular Report<br />

(DVR) System were being processed by the EDP Department, the EDP Zonal<br />

Computer Centres were started as per the requirements at the following<br />

locations:-<br />

Year<br />

a) Magathane Depot 1992<br />

b) Bandra Depot 1994<br />

c) Dharavi Depot 1994<br />

d) Oshiwara Depot 1994<br />

e) Backbay Depot, 3 rd Floor 1994<br />

f) Gorai Depot 1996<br />

g) Mulund Depot 2001<br />

h) Majas Depot 2002<br />

1.4 All depots have been computerised in phases by June, 2004 under depot<br />

computerisation project. After the computerisation of depots as a unit, the<br />

functions of the E.D.P. Zonal Computer Centres have changed and they are<br />

working as troubleshooters. Accordingly, following EDP Zonal Computer<br />

Centres have been closed as per the changed requirements :-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!