15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

835<br />

fulfilled. On compliance and payment of requisite connection<br />

fees/cable charges, the meters are installed. Before connection of<br />

Supply, however, the wiring etc. in the premises of the consumer is<br />

inspected and connection is not given, if there are any defects or the<br />

installation does not comply with Electricity Rules.<br />

When meters are installed, their particulars are indicated in the<br />

Connection Order Register. On connecting the supply, necessary entry<br />

is made and the duplicate connection order is sent to the Consumers<br />

Department for opening an account for billing purposes.<br />

8.4.1 New Connections:<br />

On receipt of a connection order, the Consumers Department opens an<br />

account in each case. This is done in the New Accounts Section. An<br />

account number is allocated according to the area where the new<br />

Supply has been connected. On opening an account, the Section<br />

notes the account numbers against the connection order noted in the<br />

Connection Order Register maintained by it.<br />

The duplicate copy of the Connection Order, incorporating therein the<br />

new account number, is sent to the Distribution and Commercial<br />

Department and a note of the same is made against the Connection<br />

Order in their Register. Once the account number is allocated, the<br />

EDPM is advised to feed this new data into the Master File for purpose<br />

of Computer Billing.<br />

8.4.2 Reading Files:<br />

After opening a reading folio for a new account, meters are read<br />

by a Meter Reader every month or alternate month as the case<br />

may be. He reads the meter, notes down the present readings to<br />

arrive at the actual units consumed. If for any reason he is not<br />

able to read a meter he submits his report to his department.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!